Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 3, 2021, 11:18 AM
  • F 0220_F 0219_332021_040604.mp4

Date
03/03/2021
W/O
0875105
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00050
PipeID
P10350
Time
3:18 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H1738
Sewer Name
F JOINT OUTFALL F - UNIT 7H
City
CERRITOS
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
38
Purpose
Routine Assessment
Project
20210303MDM_JOINT_OUTFALL_UNIT_7H
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Upstream MH
F 0220
Downstream MH
F 0219
Dir. of Survey
Downstream
Length Surveyed
345.8 ft.
Total Length
345.8 ft.
Structural Index
3
Structural Quick
3222
Structural Rating
10
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
10
Pipe schematic from manhole F 0220 to F 0219
MH: F 0220MH: F 0219downstream0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 4:10AM0 ft. MGO - General Observation - Conn. @ Mh, 3 O' Clock. Active2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE13.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES - BLISTERING PEELING CONCRETE71.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Capped144 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG SPORATIC173.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Capped268.2 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 6" - Open345.2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG SPORATIC345.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - BLISTERING PEELING CONCRETE345.8 ft. AMH - Downstream Manhole, Survey Ends - 4:30AM

Observation photos (4)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG SPORATIC

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES - BLISTERING PEELING CONCRETE

    13.1 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES - BLISTERING PEELING CONCRETE

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG SPORATIC

    144 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG SPORATIC

Observations (14)

DistanceCodeObservation
0MWL
2SAPSEVERE AGG SPORATIC
13.1SSSBLISTERING PEELING CONCRETE
0MWM
345.2SAPSEVERE AGG SPORATIC
0AMH4:10AM
71.5TFCCapped
144SAPSEVERE AGG SPORATIC
2SSSBLISTERING PEELING CONCRETE
268.2TFOpen
345.2SSSBLISTERING PEELING CONCRETE
345.8AMH4:30AM
0MGOConn. @ Mh, 3 O' Clock. Active
173.6TFCCapped

Properties (6)

custom_field_three
SEVERE AGG PROJECTING SPORATIC
custom_field_two
3
customer
LACSD
datetime
2021-03-03T03:18:28-08:00
documentation
MARTIN,OLIVER 111,CASTILLO,RUVALCABA
is_lateral_inspection
false