Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 3, 2021, 08:24 AM
  • 18 1078_18 0451_332021_005422.mp4

Date
03/03/2021
W/O
088324
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00675
PipeID
P14938
Time
12:24 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H1737
Sewer Name
18 FLORENCE AVENUE TRUNK
City
SANTA FE SPRINGS
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
20
Purpose
Maintenance Related
Project
20210303MDM_FLORENCE_AVENUE_TRUNK
Material
Vitrified Clay Pipe
Shape
Circular
Height
18 in.
Upstream MH
18 1078
Downstream MH
18 0451
Dir. of Survey
Downstream
Length Surveyed
331.1 ft.
Total Length
331.1 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
4125
O&M Rating
14
Overall Index
2
Overall Quick
Overall Rating
14
Pipe schematic from manhole 18 1078 to 18 0451
MH: 18 1078MH: 18 0451downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 12:45AM0 ft. MWM - Water Mark, 30 %of cross sectional area1 ft. MGO - General Observation - HOT STREAM FLOW30.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start - 5% OR LESS38.3 ft. MGP - General Photograph - GREASE ON SIDED OF PIPE263.6 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: NO270.8 ft. DSGV - Deposits Settled Gravel, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start277.3 ft. MWL - Water Level, 20 %of cross sectional area277.4 ft. MWM - Water Mark, 70 %of cross sectional area280.1 ft. DSGV - Deposits Settled Gravel, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish285.7 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES - ROCK298.8 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start - ROCKS312 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish - ROCKS321.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Finish331.1 ft. AMH - Downstream Manhole, Survey Ends - 1:25AM

Observation photos (3)

  • Deposits Attached Grease, 5 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES, Start - 5% OR LESS

    30.6 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start - 5% OR LESS

  • General Photograph - GREASE ON SIDED OF PIPE

    38.3 ft. - General Photograph - GREASE ON SIDED OF PIPE

  • Deposits Attached Grease, 5 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: NO

    263.6 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: NO

Observations (16)

DistanceCodeObservation
312DSZROCKS
277.3MWL
1MGOHOT STREAM FLOW
285.7DSZROCK
0MWL
298.8DSZROCKS
0AMH12:45AM
331.1AMH1:25AM
277.4MWM
321.1DAGS
270.8DSGV
0MWM
30.6DAGS5% OR LESS
263.6DAGS
280.1DSGV
38.3MGPGREASE ON SIDED OF PIPE

Properties (6)

additional_info
GREASE DEBRIES EVALUATION ONLY
customer
LACSD
datetime
2021-03-03T00:24:08-08:00
documentation
MARTIN,OLIVER 111,CASTILLO,RUVALCABA
is_lateral_inspection
false
year_laid
19750610