Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 28, 2020, 09:46 AM
  • J 0032A_J 0032_12282020_015455.mp4

Date
12/28/2020
W/O
860123
Weather
Light Rain
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00061
PipeID
P11609
Time
1:46 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8291
Sewer Name
J JOINT OUTFALL J - UNIT 2B
City
LOMITA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
36
Purpose
Routine Assessment
Project
RFIR_WO_860123_TV05231_NOV2020
Sewer Type
Siphon
Material
Reinforced Concrete Pipe
Shape
Circular
Height
51 in.
Width
51 in.
Upstream MH
J 0032
Downstream MH
J 0032A
Dir. of Survey
Upstream
Length Surveyed
2 ft.
Total Length
2 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
3
O&M Quick
4121
O&M Rating
6
Overall Index
3
Overall Quick
Overall Rating
11
Pipe schematic from manhole J 0032 to J 0032A
MH: J 0032MH: J 0032Aupstream0 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES0 ft. MSA - Survey Abandoned - VIEW OF UPLEG OF D/S SIPHON.0 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES0 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES2 ft. AMH - Downstream Manhole, Survey Begins - J 00322 ft. MWM - Water Mark, 45 %of cross sectional area2 ft. MWL - Water Level, 40 %of cross sectional area

Observation photos (4)

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES

  • Survey Abandoned - VIEW OF UPLEG OF D/S SIPHON.

    2 ft. - Survey Abandoned - VIEW OF UPLEG OF D/S SIPHON.

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES

Observations (7)

DistanceCodeObservation
0AMHJ 0032
0MWM
2DAGS
0MWL
2MSAVIEW OF UPLEG OF D/S SIPHON.
2SSS
2SAP

Properties (8)

additional_info
630069122820001
custom_field_three
SPALLING/PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2020-12-28T01:46:00-08:00
documentation
PRO PIPE
is_lateral_inspection
false
year_laid
36539