B 0381_B 0380_2262021_021752.mp4
2 ft. - General Observation - MAG COAT 100% START
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE UNDER MAG COAT
23.5 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG UNDER MAG COAT
71.4 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING CONCRETE
91.4 ft. - General Observation - 95% MAG COAT START
129.8 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING PEELING CONCRETE
133.2 ft. - General Observation - 80% MAG COAT START
150.9 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: NO, Start - SEVERE AGG MISSING
326.8 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG
| Distance | Code | Observation |
|---|---|---|
| 23.5 | SAM | SEVERE AGG UNDER MAG COAT |
| 150.9 | SAM | SEVERE AGG MISSING |
| 91.4 | MGO | 95% MAG COAT START |
| 330.9 | AMH | 2:35AM |
| 330.6 | SAM | SEVERE AGG |
| 0 | MWL | — |
| 0 | MWM | — |
| 71.4 | SSS | BLISTERING CONCRETE |
| 2 | MGO | MAG COAT 100% START |
| 330.6 | MGO | MAG COAT 80% FINISH |
| 0.9 | MGO | Conn. @ Mh, 9 O' Clock. Active |
| 133.2 | MGO | 80% MAG COAT START |
| 2 | SSS | BLISTERING PEELING CONCRETE UNDER MAG COAT |
| 330.6 | SSS | BLISTERING PEELING CONCRETE UNDER MAG COAT |
| 0 | AMH | 2:10AM |
| 129.8 | SSS | BLISTERING PEELING CONCRETE |
| 0.9 | MGO | Conn. @ Mh, 3 O' Clock. OPEN |
| 326.8 | SAM | SEVERE AGG |