Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 10, 2021, 07:34 AM
  • J 0053_J 0052_02092021_234636.mp4

Date
02/09/2021
W/O
870730
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00062
PipeID
P11630
Time
11:34 PM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8471
Sewer Name
J JOINT OUTFALL J - UNIT 2C
City
LOMITA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
32
Purpose
Routine Assessment
Project
RFIR_WO_870730_TV05287_JAN2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
42 in.
Width
42 in.
Upstream MH
J 0053
Downstream MH
J 0052
Dir. of Survey
Downstream
Length Surveyed
309.8 ft.
Total Length
309.8 ft.
Structural Index
3
Structural Quick
5J3K
Structural Rating
595
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
595
Pipe schematic from manhole J 0053 to J 0052
MH: J 0053MH: J 0052downstream0 ft. AMH - Upstream Manhole, Survey Begins - J 00530 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT THE MH 3 OC'LOCK0 ft. MWL - Water Level, 20 %of cross sectional area2.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.1 ft. MGO - General Observation - MAG COAT23.5 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start134.7 ft. TFA - Tap Factory Made Active, at 12 o'clock, -, within 8 inches of joint: NO, 6"309.8 ft. AMH - Downstream Manhole, Survey Ends - J 0052309.8 ft. SRV - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish309.8 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish309.8 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (2)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    23.5 ft. - Surface Reinforcement Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (13)

DistanceCodeObservation
309.8AMHJ 0052
23.5SRV
0AMHJ 0053
0MWM
309.8SRV
134.7TFA
309.8SAP
0MGOCONNECTION AT THE MH 3 OC'LOCK
309.8SSS
2.1SSS
2.1SAP
0MWL
2.1MGOMAG COAT

Properties (7)

additional_info
630074020921202
custom_field_three
SPALLING/ AGGREGATE PROJECTING
custom_field_two
2
customer
1
datetime
2021-02-09T23:34:03-08:00
documentation
PROPIPE
is_lateral_inspection
false