Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 10, 2021, 08:06 AM
  • J 0050_J 0048_02102021_002242.mp4

Date
02/10/2021
W/O
870730
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00062
PipeID
P11627
Time
12:06 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8471
Sewer Name
J JOINT OUTFALL J - UNIT 2C
City
LOMITA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
32
Purpose
Routine Assessment
Project
RFIR_WO_870730_TV05287_JAN2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
42 in.
Width
42 in.
Upstream MH
J 0050
Downstream MH
J 0048
Dir. of Survey
Downstream
Length Surveyed
573.4 ft.
Total Length
573.4 ft.
Structural Index
3
Structural Quick
3V2V
Structural Rating
570
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
570
Pipe schematic from manhole J 0050 to J 0048
MH: J 0050MH: J 0048downstream0 ft. AMH - Upstream Manhole, Survey Begins - J 00500 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. MWL - Water Level, 20 %of cross sectional area5.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start5.2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start5.2 ft. MGO - General Observation - MAG COAT573.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish573.4 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish573.4 ft. AMH - Downstream Manhole, Survey Ends - J 0048573.4 ft. MGO - General Observation - CONNECTION AT THE MH 9 OC'LOCK

Observation photos (2)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    5.2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    5.2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (10)

DistanceCodeObservation
573.4SSS
573.4SAP
0AMHJ 0050
0MWM
5.2SSS
573.4AMHJ 0048
573.4MGOCONNECTION AT THE MH 9 OC'LOCK
5.2SAP
0MWL
5.2MGOMAG COAT

Properties (7)

additional_info
630074020921202
custom_field_three
SPALLING/ AGGREGATE PROJECTING
custom_field_two
2
customer
1
datetime
2021-02-10T00:06:00-08:00
documentation
PROPIPE
is_lateral_inspection
false