Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 10, 2021, 08:51 AM
  • J 0048_J 0046_02102021_011234.mp4

Date
02/10/2021
W/O
870730
Weather
Dry
Operator/Surveyor
B.FUGATE
Sewer ID
Z00062
PipeID
P11625
Time
12:51 AM
Certificate
U-508-7069
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8471
Sewer Name
J JOINT OUTFALL J - UNIT 2C
City
LOMITA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
32
Purpose
Routine Assessment
Project
RFIR_WO_870730_TV05287_JAN2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
42 in.
Width
42 in.
Upstream MH
J 0048
Downstream MH
J 0046
Dir. of Survey
Downstream
Length Surveyed
738.4 ft.
Total Length
738.4 ft.
Structural Index
3
Structural Quick
3\2\
Structural Rating
735
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
735
Pipe schematic from manhole J 0048 to J 0046
MH: J 0048MH: J 0046downstream0 ft. AMH - Upstream Manhole, Survey Begins - J 00480 ft. MGO - General Observation - CONNECTION AT THE MH 9 OC'LOCK0 ft. MWL - Water Level, 20 %of cross sectional area0.5 ft. MWM - Water Mark, 30 %of cross sectional area2.2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.2 ft. MGO - General Observation - MAG COAT2.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start738.4 ft. MGO - General Observation - CONNECTION AT THE MH 9 OC'LOCK738.4 ft. AMH - Downstream Manhole, Survey Ends - J 0046738.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish738.4 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (2)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.3 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (11)

DistanceCodeObservation
0AMHJ 0048
0MGOCONNECTION AT THE MH 9 OC'LOCK
2.2SAP
738.4MGOCONNECTION AT THE MH 9 OC'LOCK
0MWL
738.4AMHJ 0046
0.5MWM
738.4SSS
2.3SSS
2.2MGOMAG COAT
738.4SAP

Properties (7)

additional_info
630074020921202
custom_field_three
SPALLING/ AGGREGATE PROJECTING
custom_field_two
2
customer
1
datetime
2021-02-10T00:51:13-08:00
documentation
PROPIPE
is_lateral_inspection
false