Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 9, 2021, 10:36 AM
  • 22 0246_22 0245_02092021_025339.mp4

Date
02/09/2021
W/O
870521
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00793
PipeID
P16528
Time
2:36 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8396
Sewer Name
22 CAMERON TRUNK, SECTS 1,2,&3
City
WEST COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
36
Purpose
Routine Assessment
Project
RFIR_WO_870521_TV22160_JAN2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0245
Downstream MH
22 0246
Dir. of Survey
Upstream
Length Surveyed
305.8 ft.
Total Length
305.8 ft.
Structural Index
3
Structural Quick
3K2K
Structural Rating
300
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
300
Pipe schematic from manhole 22 0245 to 22 0246
MH: 22 0245MH: 22 0246upstream0 ft. MGO - General Observation - CONNECTION AT MH, 11 O'CLOCK CAPPED0 ft. AMH - Upstream Manhole, Survey Ends - 22 02461.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish1.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish19.6 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 8"53.3 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 8"56 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 8"80.4 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 8"83.7 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 8"144.8 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 8"147 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 8"211.2 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 8"214.4 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 8"257.3 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 8"263.5 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 8"303.7 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start303.7 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start303.7 ft. MGO - General Observation - MAG COAT305.8 ft. MWM - Water Mark, 35 %of cross sectional area305.8 ft. MWL - Water Level, 15 %of cross sectional area305.8 ft. AMH - Downstream Manhole, Survey Begins - 22 0245

Observation photos (3)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - MAG COAT

    2.1 ft. - General Observation - MAG COAT

Observations (21)

DistanceCodeObservation
304.5SSS
0MWM
2.1SAP
304.5SAP
222.1TFC
2.1SSS
225.4TF
94.6TFC
48.5TF
0MWL
158.8TFC
2.1MGOMAG COAT
0AMH22 0245
42.3TFC
91.4TFC
286.2TFC
252.5TFC
161TFC
249.8TF
305.8MGOCONNECTION AT MH, 11 O'CLOCK CAPPED
305.8AMH22 0246

Properties (6)

custom_field_three
AGGREGATE PROJECTING,SPALLING
custom_field_two
3
customer
1
datetime
2021-02-09T02:36:59-08:00
documentation
PRO PIPE
is_lateral_inspection
false