Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 9, 2021, 09:47 AM
  • 22 0241_22 0240_02092021_020302.mp4

Date
02/09/2021
W/O
870521
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00793
PipeID
P16523
Time
1:47 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8396
Sewer Name
22 CAMERON TRUNK, SECTS 1,2,&3
City
WEST COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
35
Purpose
Routine Assessment
Project
RFIR_WO_870521_TV22160_JAN2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0241
Downstream MH
22 0240
Dir. of Survey
Downstream
Length Surveyed
166.3 ft.
Total Length
166.3 ft.
Structural Index
3
Structural Quick
3E2E
Structural Rating
160
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
160
Pipe schematic from manhole 22 0241 to 22 0240
MH: 22 0241MH: 22 0240downstream0 ft. AMH - Upstream Manhole, Survey Begins - 22 02410 ft. MGO - General Observation - CONNECTION AT MH, 3 O'CLOCK0 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area2.1 ft. MGO - General Observation - MAG COAT2.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start18.1 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 8"21 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 8"39.4 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 8"79 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 8"112.4 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 8"130.7 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 8"163.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish163.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish166.3 ft. MGO - General Observation - CONNECTION AT MH, 9 O'CLOCK166.3 ft. AMH - Downstream Manhole, Survey Ends - 22 0240

Observation photos (3)

  • General Observation - MAG COAT

    2.1 ft. - General Observation - MAG COAT

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (17)

DistanceCodeObservation
2.1MGOMAG COAT
21TFC
0AMH22 0241
0MGOCONNECTION AT MH, 3 O'CLOCK
166.3MGOCONNECTION AT MH, 9 O'CLOCK
0MWM
2.1SSS
79TFC
112.4TFC
39.4TFC
166.3AMH22 0240
163.1SSS
0MWL
130.7TFC
18.1TFC
163.1SAP
2.1SAP

Properties (6)

custom_field_three
AGGREGATE PROJECTING,SPALLING
custom_field_two
3
customer
1
datetime
2021-02-09T01:47:31-08:00
documentation
PRO PIPE
is_lateral_inspection
false