Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 10, 2021, 06:41 AM
  • 22 0238_22 0237_02092021_231021.mp4

Date
02/09/2021
W/O
870521
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00793
PipeID
P16520
Time
10:41 PM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8398
Sewer Name
22 CAMERON TRUNK, SECTS 1,2,&3
City
WEST COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
35
Purpose
Routine Assessment
Project
RFIR_WO_870521_TV22160_JAN2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0238
Downstream MH
22 0237
Dir. of Survey
Downstream
Length Surveyed
380.1 ft.
Total Length
380.1 ft.
Structural Index
3
Structural Quick
3N2N
Structural Rating
375
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
375
Pipe schematic from manhole 22 0238 to 22 0237
MH: 22 0238MH: 22 0237downstream0 ft. AMH - Upstream Manhole, Survey Begins - 22 02380 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH, 3 O'CLOCK2.6 ft. MGO - General Observation - MAG COAT2.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start45.7 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 8"91.3 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 8"94.5 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 8"115.9 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 8"142.9 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 8"191.3 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 8"209.8 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 8"249.1 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 8"300.2 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 8"324.5 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 8"348.9 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 8"377.5 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish377.5 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish380.1 ft. AMH - Downstream Manhole, Survey Ends - 22 0237380.1 ft. MGO - General Observation - CONNECTION AT MH, 3 AND 9 O'CLOCK

Observation photos (3)

  • General Observation - MAG COAT

    2.6 ft. - General Observation - MAG COAT

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.6 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.6 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (22)

DistanceCodeObservation
348.9TFC
2.6MGOMAG COAT
115.9TF
380.1AMH22 0237
45.7TFC
0AMH22 0238
0MWM
377.5SSS
0MWL
380.1MGOCONNECTION AT MH, 3 AND 9 O'CLOCK
249.1TF
2.6SAP
377.5SAP
0MGOCONNECTION AT MH, 3 O'CLOCK
2.6SSS
191.3TFC
91.3TF
209.8TFC
142.9TFC
324.5TF
300.2TFC
94.5TF

Properties (6)

custom_field_three
AGGREGATE PROJECTING,SPALLING
custom_field_two
3
customer
1
datetime
2021-02-09T22:41:32-08:00
documentation
PRO PIPE
is_lateral_inspection
false