Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 10, 2021, 08:24 AM
  • 22 0235_22 0234_02102021_005321.mp4

Date
02/10/2021
W/O
870521
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00793
PipeID
P16517
Time
12:24 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8398
Sewer Name
22 CAMERON TRUNK, SECTS 1,2,&3
City
WEST COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
35
Purpose
Routine Assessment
Project
RFIR_WO_870521_TV22160_JAN2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
22 0235
Downstream MH
22 0234
Dir. of Survey
Downstream
Length Surveyed
412.9 ft.
Total Length
412.9 ft.
Structural Index
3
Structural Quick
3O2O
Structural Rating
404
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
404
Pipe schematic from manhole 22 0235 to 22 0234
MH: 22 0235MH: 22 0234downstream0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 22 02350 ft. MWM - Water Mark, 35 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start7.6 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 8"11.3 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 8"13.7 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start56.6 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 8"60.5 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 8"102.5 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 8"105.8 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 8"151.6 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 8"153.9 ft. TB - Tap Break-In, at 11 o'clock, -, within 8 inches of joint: YES, 8"154.2 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 8"199.9 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 8"202.8 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 8"251.7 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 8"254.3 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 8"300.3 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 8"302.9 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 8"348.9 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 8"352.1 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 8"397.1 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 8"400.3 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 8"410.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish410.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish412.9 ft. AMH - Downstream Manhole, Survey Ends - 22 0234

Observation photos (2)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    13.7 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (27)

DistanceCodeObservation
13.7SSS
400.3TFC
0MWL
102.5TFC
412.9AMH22 0234
151.6TFC
199.9TFC
11.3TFC
410.3SAP
410.3SSS
105.8TFC
56.6TFC
0AMH22 0235
154.2TFC
397.1TFC
60.5TF
2SAP
202.8TFC
348.9TF
153.9TB
300.3TFC
352.1TFC
254.3TFC
7.6TF
251.7TFC
0MWM
302.9TFC

Properties (6)

custom_field_three
AGGREGATE PROJECTING,SPALLING
custom_field_two
3
customer
1
datetime
2021-02-10T00:24:51-08:00
documentation
PRO PIPE
is_lateral_inspection
false