Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 10, 2021, 10:23 AM
  • 22 0233_22 0232_02102021_024514.mp4

Date
02/10/2021
W/O
870521
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00793
PipeID
P16514
Time
2:23 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8398
Sewer Name
22 CAMERON TRUNK, SECTS 1,2,&3
City
WEST COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
35
Purpose
Routine Assessment
Project
RFIR_WO_870521_TV22160_JAN2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
21 in.
Width
21 in.
Upstream MH
22 0232
Downstream MH
22 0233
Dir. of Survey
Upstream
Length Surveyed
393.6 ft.
Total Length
393.6 ft.
Structural Index
2
Structural Quick
3N2O
Structural Rating
375
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
2
Overall Quick
Overall Rating
375
Pipe schematic from manhole 22 0232 to 22 0233
MH: 22 0232MH: 22 0233upstream0 ft. AMH - Upstream Manhole, Survey Ends - 22 02330 ft. MGO - General Observation - CONNECTION AT MH, 3 AND 9 O'CLOCK0.7 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish0.7 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish45.2 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 8"57.1 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 8"93.2 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 8"117.5 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 8"165 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 8"177.3 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 8"212.9 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 8"224.6 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 8"261.4 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 8"273.6 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 8"308.9 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 8"321.6 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 8"358.3 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 8"368.2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start369.3 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 8"391.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start391.6 ft. MGO - General Observation - MAG COAT393.6 ft. MWL - Water Level, 15 %of cross sectional area393.6 ft. AMH - Downstream Manhole, Survey Begins - 22 0232393.6 ft. MWM - Water Mark, 35 %of cross sectional area

Observation photos (3)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - MAG COAT

    2 ft. - General Observation - MAG COAT

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    25.4 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (24)

DistanceCodeObservation
300.4TFC
72TF
35.3TF
84.7TF
392.9SAP
25.4SAP
0MWL
216.3TFC
276.1TFC
228.6TF
2SSS
336.5TF
392.9SSS
0AMH22 0232
120TFC
169TF
180.7TF
393.6AMH22 0233
132.2TFC
393.6MGOCONNECTION AT MH, 3 AND 9 O'CLOCK
0MWM
348.4TFC
24.3TF
2MGOMAG COAT

Properties (6)

custom_field_three
AGGREGATE PROJECTING,SPALLING
custom_field_two
3
customer
1
datetime
2021-02-10T02:23:55-08:00
documentation
PRO PIPE
is_lateral_inspection
false