Wastewater/Activity/PacpInspection/1.0Feb 3, 2021, 11:58 AM
  • 22 0277_22 0276_02032021_041238.mp4

Date
02/03/2021
W/O
870414
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00793
PipeID
P16563
Time
3:58 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8389
Sewer Name
22 CAMERON TRUNK, SECTS 1,2,&3
City
WEST COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
36
Purpose
Routine Assessment
Project
RFIR_WO_870414_TV22014_JAN2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0277
Downstream MH
22 0276
Dir. of Survey
Downstream
Length Surveyed
302.8 ft.
Total Length
302.8 ft.
Structural Index
3
Structural Quick
3K2K
Structural Rating
300
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
300
Pipe schematic from manhole 22 0277 to 22 0276
MH: 22 0277MH: 22 0276downstream0 ft. MGO - General Observation - CONNECTION AT MH, 3 O'CLOCK0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 22 02770 ft. MWM - Water Mark, 30 %of cross sectional area2.4 ft. MGO - General Observation - MAG COAT2.4 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.4 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start47.6 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 8"117.1 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 8"161.4 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 8"229.5 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: YES, 8"299.9 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish299.9 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish302.8 ft. MGO - General Observation - CONNECTION AT MH, 3 O'CLOCK302.8 ft. AMH - Downstream Manhole, Survey Ends - 22 0276

Observation photos (3)

  • General Observation - MAG COAT

    2.4 ft. - General Observation - MAG COAT

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.4 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.4 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (15)

DistanceCodeObservation
0MGOCONNECTION AT MH, 3 O'CLOCK
161.4TF
299.9SSS
47.6TFC
0MWL
117.1TF
302.8MGOCONNECTION AT MH, 3 O'CLOCK
2.4MGOMAG COAT
299.9SAP
2.4SSS
2.4SAP
302.8AMH22 0276
0AMH22 0277
0MWM
229.5TFC

Properties (6)

custom_field_three
AGGREGATE PROJECTING, SPALLING
custom_field_two
3
customer
1
datetime
2021-02-03T03:58:53-08:00
documentation
PRO PIPE
is_lateral_inspection
false