Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 19, 2021, 10:38 AM
  • 22 0298_22 0297_01192021_025950.mp4

Date
01/19/2021
W/O
870414
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00793
PipeID
P16584
Time
2:38 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8383
Sewer Name
22 CAMERON TRUNK, SECTS 1,2,&3
City
WEST COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
32
Purpose
Routine Assessment
Project
RFIR_WO_870414_TV22014_JAN2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
22 0298
Downstream MH
22 0297
Dir. of Survey
Downstream
Length Surveyed
424 ft.
Total Length
424 ft.
Structural Index
3
Structural Quick
4131
Structural Rating
9
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
9
Pipe schematic from manhole 22 0298 to 22 0297
MH: 22 0298MH: 22 0297downstream0 ft. AMH - Upstream Manhole, Survey Begins - 22 02980 ft. MWL - Water Level, 5 %of cross sectional area0 ft. MWM - Water Mark, 20 %of cross sectional area2 ft. SAP - Surface Aggregate Projecting, from 07 to 05 o'clock, within 8 inches of joint: YES, Start11.8 ft. FM - Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES14.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start44.2 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 8"48.3 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 8"122.9 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 8"126.8 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 8"177.3 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 8"196.5 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 8"235.9 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 8"268.2 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 8"303.4 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 8"323.2 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 8"355 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 8"386.8 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 8"414.6 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 8"420.8 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish420.8 ft. SAP - Surface Aggregate Projecting, from 07 to 05 o'clock, within 8 inches of joint: YES, Finish424 ft. AMH - Downstream Manhole, Survey Ends - 22 0297

Observation photos (3)

  • Surface Aggregate Projecting, from 07 to 05 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 07 to 05 o'clock, within 8 inches of joint: YES, Start

  • Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

    11.8 ft. - Fracture Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    14.1 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (22)

DistanceCodeObservation
420.8SSS
44.2TFC
0AMH22 0298
11.8FM
126.8TF
355TF
0MWL
122.9TFC
424AMH22 0297
177.3TF
268.2TF
386.8TFC
196.5TF
303.4TF
235.9TF
2SAP
414.6TF
420.8SAP
14.1SSS
48.3TF
323.2TFC
0MWM

Properties (6)

custom_field_three
AGGREGATE PROJECTING, SPALLING
custom_field_two
2
customer
1
datetime
2021-01-19T02:38:04-08:00
documentation
PRO PIPE
is_lateral_inspection
false