Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 19, 2021, 11:05 AM
  • 22 0297_22 0296_01192021_032520.mp4

Date
01/19/2021
W/O
870414
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00793
PipeID
P16583
Time
3:05 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8383
Sewer Name
22 CAMERON TRUNK, SECTS 1,2,&3
City
WEST COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
32
Purpose
Routine Assessment
Project
RFIR_WO_870414_TV22014_JAN2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
22 0297
Downstream MH
22 0296
Dir. of Survey
Downstream
Length Surveyed
412.2 ft.
Total Length
412.2 ft.
Structural Index
3
Structural Quick
3121
Structural Rating
5
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
5
Pipe schematic from manhole 22 0297 to 22 0296
MH: 22 0297MH: 22 0296downstream0 ft. AMH - Upstream Manhole, Survey Begins - 22 02970 ft. MWL - Water Level, 5 %of cross sectional area0 ft. MWM - Water Mark, 35 %of cross sectional area2.1 ft. SAP - Surface Aggregate Projecting, from 07 to 05 o'clock, within 8 inches of joint: YES, Start2.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start26.4 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 8"62 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 8"86 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 8"125.7 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 8"153.5 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 8"180.9 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 8"208.7 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 8"244.6 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 8"276.3 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 8"296 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 8"343.3 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 8"347.1 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 8"403 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 8"409.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish409.3 ft. SAP - Surface Aggregate Projecting, from 07 to 05 o'clock, within 8 inches of joint: YES, Finish412.2 ft. AMH - Downstream Manhole, Survey Ends - 22 0296412.2 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK

Observation photos (2)

  • Surface Aggregate Projecting, from 07 to 05 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Aggregate Projecting, from 07 to 05 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (22)

DistanceCodeObservation
412.2AMH22 0296
125.7TF
180.9TF
0AMH22 0297
409.3SSS
343.3TF
208.7TFC
244.6TF
0MWL
2.1SAP
86TFC
296TF
403TF
2.1SSS
26.4TFC
409.3SAP
276.3TF
0MWM
347.1TFC
412.2MGOCONNECTION AT MH 3 O'CLOCK
62TF
153.5TF

Properties (6)

custom_field_three
AGGREGATE PROJECTING, SPALLING
custom_field_two
2
customer
1
datetime
2021-01-19T03:05:17-08:00
documentation
PRO PIPE
is_lateral_inspection
false