Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 2, 2021, 09:52 AM
  • 22 0295_22 0294_02022021_021248.mp4

Date
02/02/2021
W/O
870414
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00793
PipeID
P16581
Time
1:52 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8388
Sewer Name
22 CAMERON TRUNK, SECTS 1,2,&3
City
WEST COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
32
Purpose
Routine Assessment
Project
RFIR_WO_870414_TV22014_JAN2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
22 0295
Downstream MH
22 0294
Dir. of Survey
Downstream
Length Surveyed
360.1 ft.
Total Length
360.1 ft.
Structural Index
3
Structural Quick
3M2M
Structural Rating
350
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
350
Pipe schematic from manhole 22 0295 to 22 0294
MH: 22 0295MH: 22 0294downstream0 ft. MWM - Water Mark, 15 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH, 3 O'CLOCK0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 22 02952 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start10.8 ft. JSM - Joint Separated Medium15.6 ft. SSS - Surface Spalling, from 07 to 05 o'clock, within 8 inches of joint: YES, Start26.6 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 8"68 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 8"115.7 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 8"148.3 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 8"233.7 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 8"290.3 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 8"357.8 ft. SSS - Surface Spalling, from 07 to 05 o'clock, within 8 inches of joint: YES, Finish357.8 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish360.1 ft. MGO - General Observation - CONNECTION AT MH, 3 O'CLOCK360.1 ft. AMH - Downstream Manhole, Survey Ends - 22 0294

Observation photos (3)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Joint Separated Medium

    10.8 ft. - Joint Separated Medium

  • Surface Spalling, from 07 to 05 o'clock, within 8 inches of joint: YES, Start

    15.6 ft. - Surface Spalling, from 07 to 05 o'clock, within 8 inches of joint: YES, Start

Observations (17)

DistanceCodeObservation
357.8SSS
0MWM
233.7TF
0MGOCONNECTION AT MH, 3 O'CLOCK
26.6TF
360.1MGOCONNECTION AT MH, 3 O'CLOCK
0MWL
68TFC
10.8JSM
148.3TF
115.7TF
0AMH22 0295
360.1AMH22 0294
2SAP
15.6SSS
290.3TF
357.8SAP

Properties (6)

custom_field_three
SPALLING AGGREGATE PROJECTING
custom_field_two
3
customer
1
datetime
2021-02-02T01:52:32-08:00
documentation
PRO PIPE
is_lateral_inspection
false