Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 2, 2021, 10:14 AM
  • 22 0294_22 0293_02022021_023226.mp4

Date
02/02/2021
W/O
870414
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00793
PipeID
P16580
Time
2:14 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8388
Sewer Name
22 CAMERON TRUNK, SECTS 1,2,&3
City
WEST COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
32
Purpose
Routine Assessment
Project
RFIR_WO_870414_TV22014_JAN2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
22 0294
Downstream MH
22 0293
Dir. of Survey
Downstream
Length Surveyed
377.5 ft.
Total Length
377.5 ft.
Structural Index
3
Structural Quick
3N2M
Structural Rating
366
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
366
Pipe schematic from manhole 22 0294 to 22 0293
MH: 22 0294MH: 22 0293downstream0 ft. AMH - Upstream Manhole, Survey Begins - 22 02940 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH, 3 O'CLOCK2.4 ft. SAP - Surface Aggregate Projecting, from 07 to 05 o'clock, within 8 inches of joint: YES, Start14 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start35.5 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 8"84.8 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 8"181.5 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 8"246.4 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 8"306.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 8"331.2 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 8"374.2 ft. SAP - Surface Aggregate Projecting, from 07 to 05 o'clock, within 8 inches of joint: YES, Finish374.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish377.5 ft. AMH - Downstream Manhole, Survey Ends - 22 0293377.5 ft. MGO - General Observation - CONNECTION AT MH, 3 O'CLOCK

Observation photos (2)

  • Surface Aggregate Projecting, from 07 to 05 o'clock, within 8 inches of joint: YES, Start

    2.4 ft. - Surface Aggregate Projecting, from 07 to 05 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    14 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (16)

DistanceCodeObservation
0AMH22 0294
2.4SAP
35.5TF
0MWM
84.8TF
374.2SAP
377.5AMH22 0293
0MWL
374.2SSS
377.5MGOCONNECTION AT MH, 3 O'CLOCK
0MGOCONNECTION AT MH, 3 O'CLOCK
181.5TF
14SSS
331.2TF
306.8TFC
246.4TF

Properties (6)

custom_field_three
SPALLING AGGREGATE PROJECTING
custom_field_two
3
customer
1
datetime
2021-02-02T02:14:13-08:00
documentation
PRO PIPE
is_lateral_inspection
false