Wastewater/Activity/PacpInspection/1.0Feb 2, 2021, 10:33 AM
  • 22 0293_22 0292_02022021_025401.mp4

Date
02/02/2021
W/O
870414
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00793
PipeID
P16579
Time
2:33 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8388
Sewer Name
22 CAMERON TRUNK, SECTS 1,2,&3
City
WEST COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
32
Purpose
Routine Assessment
Project
RFIR_WO_870414_TV22014_JAN2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
22 0293
Downstream MH
22 0292
Dir. of Survey
Downstream
Length Surveyed
349.3 ft.
Total Length
349.3 ft.
Structural Index
3
Structural Quick
3M2L
Structural Rating
341
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
341
Pipe schematic from manhole 22 0293 to 22 0292
MH: 22 0293MH: 22 0292downstream0 ft. AMH - Upstream Manhole, Survey Begins - 22 02930 ft. MGO - General Observation - CONNECTION AT MH, 3 O'CLOCK0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. MWM - Water Mark, 35 %of cross sectional area2.4 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start11 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start64.6 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 8"73.1 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 8"137.7 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 8"141.8 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 8"218.6 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 8"222.7 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 8"230.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 8"346.8 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish346.8 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish349.3 ft. MGO - General Observation - CONNECTION AT MH, 3 O'CLOCK349.3 ft. AMH - Downstream Manhole, Survey Ends - 22 0292

Observation photos (2)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.4 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    11 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (17)

DistanceCodeObservation
73.1TF
346.8SSS
218.6TF
0AMH22 0293
222.7TF
0MGOCONNECTION AT MH, 3 O'CLOCK
137.7TF
346.8SAP
349.3MGOCONNECTION AT MH, 3 O'CLOCK
349.3AMH22 0292
11SSS
0MWL
64.6TF
2.4SAP
230.9TFC
0MWM
141.8TF

Properties (6)

custom_field_three
SPALLING AGGREGATE PROJECTING
custom_field_two
3
customer
1
datetime
2021-02-02T02:33:32-08:00
documentation
PRO PIPE
is_lateral_inspection
false