Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 2, 2021, 12:01 PM
  • 22 0290_22 0289_02022021_041450.mp4

Date
02/02/2021
W/O
870414
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00793
PipeID
P16576
Time
4:01 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8388
Sewer Name
22 CAMERON TRUNK, SECTS 1,2,&3
City
WEST COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
31
Purpose
Routine Assessment
Project
RFIR_WO_870414_TV22014_JAN2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
22 0290
Downstream MH
22 0289
Dir. of Survey
Downstream
Length Surveyed
274.2 ft.
Total Length
274.2 ft.
Structural Index
3
Structural Quick
4E3J
Structural Rating
398
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
398
Pipe schematic from manhole 22 0290 to 22 0289
MH: 22 0290MH: 22 0289downstream0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. MGO - General Observation - CONNECTION AT MH, 3 O'CLOCK0 ft. AMH - Upstream Manhole, Survey Begins - 22 02900 ft. MWM - Water Mark, 35 %of cross sectional area3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start6.7 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start53.2 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 8"69.1 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 8"158.8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 8"162.9 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 8"165.8 ft. FM - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish199.4 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 8"219.7 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 8"268.8 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 8"271.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish271.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish274.2 ft. AMH - Downstream Manhole, Survey Ends - 22 0289

Observation photos (3)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    3 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    6.7 ft. - Fracture Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (18)

DistanceCodeObservation
274.2AMH22 0289
271.1SAP
219.7TF
162.9TF
0MWL
0MGOCONNECTION AT MH, 3 O'CLOCK
0AMH22 0290
3SAP
199.4TF
3SSS
165.8FM
268.8TF
0MWM
6.7FM
53.2TF
158.8TF
69.1TF
271.1SSS

Properties (6)

custom_field_three
SPALLING AGGREGATE PROJECTING
custom_field_two
3
customer
1
datetime
2021-02-02T04:01:26-08:00
documentation
PRO PIPE
is_lateral_inspection
false