Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 3, 2021, 09:01 AM
  • 22 0289_22 0288_02032021_012828.mp4

Date
02/03/2021
W/O
870414
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00793
PipeID
P16575
Time
1:01 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8389
Sewer Name
22 CAMERON TRUNK, SECTS 1,2,&3
City
WEST COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
31
Purpose
Routine Assessment
Project
RFIR_WO_870414_TV22014_JAN2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
22 0288
Downstream MH
22 0289
Dir. of Survey
Upstream
Length Surveyed
266.2 ft.
Total Length
266.2 ft.
Structural Index
3
Structural Quick
3I2I
Structural Rating
260
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
260
Pipe schematic from manhole 22 0288 to 22 0289
MH: 22 0288MH: 22 0289upstream0 ft. AMH - Upstream Manhole, Survey Ends - 22 02892.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish2.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish9 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 8"65.8 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 8"90.3 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 8"114.5 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 8"163.3 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 8"196 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 8"228.5 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 8"245 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 8"263.9 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start263.9 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start266.2 ft. MWM - Water Mark, 20 %of cross sectional area266.2 ft. MWL - Water Level, 15 %of cross sectional area266.2 ft. AMH - Downstream Manhole, Survey Begins - 22 0288266.2 ft. MGO - General Observation - CONNECTION AT MH, 9 O'CLOCK

Observation photos (2)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.3 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.3 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (17)

DistanceCodeObservation
263.9SAP
257.2TF
200.4TF
0MWM
0MWL
175.9TF
102.9TF
263.9SSS
266.2AMH22 0289
37.7TF
0AMH22 0288
2.3SSS
70.2TF
151.7TF
0MGOCONNECTION AT MH, 9 O'CLOCK
2.3SAP
21.2TF

Properties (6)

custom_field_three
AGGREGATE PROJECTING, SPALLING
custom_field_two
3
customer
1
datetime
2021-02-03T01:01:30-08:00
documentation
PRO PIPE
is_lateral_inspection
false