Wastewater/Activity/PacpInspection/1.0Feb 3, 2021, 08:39 AM
  • 22 0288_22 0287_02032021_010103.mp4

Date
02/03/2021
W/O
870414
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00793
PipeID
P16574
Time
12:39 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8389
Sewer Name
22 CAMERON TRUNK, SECTS 1,2,&3
City
WEST COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
31
Purpose
Routine Assessment
Project
RFIR_WO_870414_TV22014_JAN2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
22 0287
Downstream MH
22 0288
Dir. of Survey
Upstream
Length Surveyed
325.2 ft.
Total Length
325.2 ft.
Structural Index
3
Structural Quick
3L2L
Structural Rating
320
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
320
Pipe schematic from manhole 22 0287 to 22 0288
MH: 22 0287MH: 22 0288upstream0 ft. AMH - Upstream Manhole, Survey Ends - 22 02880 ft. MGO - General Observation - CONNECTION AT MH, 9 O'CLOCK2.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish2.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish35.3 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 8"59.6 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 8"124.8 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 8"137.3 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 8"190.3 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 8"198 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 8"239.2 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 8"259.5 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 8"312.8 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 8"316.7 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 8"323.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start323.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start325.2 ft. AMH - Downstream Manhole, Survey Begins - 220287325.2 ft. MWL - Water Level, 15 %of cross sectional area325.2 ft. MWM - Water Mark, 20 %of cross sectional area

Observation photos (2)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.1 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

Observations (19)

DistanceCodeObservation
8.5TF
187.9TF
65.7TF
134.9TF
2.1SSS
323.1SSS
2.1SAP
127.2TF
0AMH220287
0MWL
200.4TF
0MWM
323.1SAP
325.2AMH22 0288
12.4TF
265.6TF
86TF
289.9TF
325.2MGOCONNECTION AT MH, 9 O'CLOCK

Properties (6)

custom_field_three
AGGREGATE PROJECTING, SPALLING
custom_field_two
3
customer
1
datetime
2021-02-03T00:39:34-08:00
documentation
PRO PIPE
is_lateral_inspection