Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 3, 2021, 06:51 AM
  • 22 0285_22 0284_02022021_230608.mp4

Date
02/02/2021
W/O
870414
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00793
PipeID
P16571
Time
10:51 PM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8389
Sewer Name
22 CAMERON TRUNK, SECTS 1,2,&3
City
WEST COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
31
Purpose
Routine Assessment
Project
RFIR_WO_870414_TV22014_JAN2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0285
Downstream MH
22 0284
Dir. of Survey
Downstream
Length Surveyed
260.1 ft.
Total Length
260.1 ft.
Structural Index
3
Structural Quick
3I2I
Structural Rating
255
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
255
Pipe schematic from manhole 22 0285 to 22 0284
MH: 22 0285MH: 22 0284downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 22 02850 ft. MGO - General Observation - CONNECTION AT MH, 3 O'CLOCK0 ft. MWM - Water Mark, 30 %of cross sectional area2.3 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.3 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.3 ft. MGO - General Observation - MAG COAT6.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 8"8.2 ft. TB - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: YES, 8"40.4 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 8"52.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 8"121.7 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 8"146.7 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: YES, 8"190.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 8"206.6 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 8"230.7 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: YES, 8"257.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish257.1 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish260.1 ft. AMH - Downstream Manhole, Survey Ends - 22 0284

Observation photos (4)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.3 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.3 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - MAG COAT

    2.3 ft. - General Observation - MAG COAT

  • Tap Break-In, at 10 o'clock, -, within 8 inches of joint: YES, 8"

    8.2 ft. - Tap Break-In, at 10 o'clock, -, within 8 inches of joint: YES, 8"

Observations (19)

DistanceCodeObservation
230.7TF
206.6TF
2.3SAP
257.1SSS
8.2TB
260.1AMH22 0284
190.2TFC
257.1SAP
0MWL
0AMH22 0285
0MGOCONNECTION AT MH, 3 O'CLOCK
146.7TF
6.7TFC
0MWM
40.4TF
2.3SSS
52.4TFC
121.7TF
2.3MGOMAG COAT

Properties (6)

custom_field_three
AGGREGATE PROJECTING, SPALLING
custom_field_two
3
customer
1
datetime
2021-02-02T22:51:10-08:00
documentation
PRO PIPE
is_lateral_inspection
false