Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 3, 2021, 10:14 AM
  • 22 0281_22 0280_02032021_022938.mp4

Date
02/03/2021
W/O
870414
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00793
PipeID
P16567
Time
2:14 AM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8389
Sewer Name
22 CAMERON TRUNK, SECTS 1,2,&3
City
WEST COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
31
Purpose
Routine Assessment
Project
RFIR_WO_870414_TV22014_JAN2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
15 in.
Width
15 in.
Upstream MH
22 0281
Downstream MH
22 0280
Dir. of Survey
Downstream
Length Surveyed
242.4 ft.
Total Length
242.4 ft.
Structural Index
3
Structural Quick
3H2H
Structural Rating
235
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
235
Pipe schematic from manhole 22 0281 to 22 0280
MH: 22 0281MH: 22 0280downstream0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 22 02810 ft. MWM - Water Mark, 35 %of cross sectional area2.6 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.6 ft. MGO - General Observation - MAG COAT2.6 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start43.4 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 8"75.7 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 8"96.6 ft. TB - Tap Break-In, at 11 o'clock, -, within 8 inches of joint: YES, 8"100.3 ft. TB - Tap Break-In, at 01 o'clock, -, within 8 inches of joint: YES, 8"104.1 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 8"148.5 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 8"157 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 8"160.5 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 8"240 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish240 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish242.4 ft. MGO - General Observation - CONNECTION AT MH, 3 O'CLOCK242.4 ft. AMH - Downstream Manhole, Survey Ends - 22 0280242.4 ft. MGO - General Observation - CONNECTION AT MH, 3 O'CLOCK

Observation photos (6)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.6 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - MAG COAT

    2.6 ft. - General Observation - MAG COAT

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.6 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Tap Break-In, at 11 o'clock, -, within 8 inches of joint: YES, 8"

    96.6 ft. - Tap Break-In, at 11 o'clock, -, within 8 inches of joint: YES, 8"

  • Tap Break-In, at 01 o'clock, -, within 8 inches of joint: YES, 8"

    100.3 ft. - Tap Break-In, at 01 o'clock, -, within 8 inches of joint: YES, 8"

  • Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 8"

    148.5 ft. - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 8"

Observations (19)

DistanceCodeObservation
0MWL
242.4MGOCONNECTION AT MH, 3 O'CLOCK
242.4AMH22 0280
75.7TF
148.5TB
160.5TFC
100.3TB
240SAP
2.6SSS
0AMH22 0281
2.6MGOMAG COAT
0MWM
240SSS
242.4MGOCONNECTION AT MH, 3 O'CLOCK
157TFC
104.1TFC
96.6TB
2.6SAP
43.4TF

Properties (6)

custom_field_three
AGGREGATE PROJECTING, SPALLING
custom_field_two
3
customer
1
datetime
2021-02-03T02:14:16-08:00
documentation
PRO PIPE
is_lateral_inspection
false