Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 5, 2021, 05:45 AM
  • 18 0308_18 0307A_01042021_215636.mp4

Date
01/04/2021
W/O
865103
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00683
PipeID
P25009
Time
9:45 PM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8402
Sewer Name
18 LA MIRADA TRUNK, SECTS 1&2
City
SANTA FE SPRINGS
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
31
Purpose
Routine Assessment
Project
RFIR_WO_865103_TV18098_DEC2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
18 0308
Downstream MH
18 0307A
Dir. of Survey
Downstream
Length Surveyed
238.4 ft.
Total Length
238.4 ft.
Structural Index
2
Structural Quick
3H2H
Structural Rating
227
O&M Index
2
O&M Quick
2H00
O&M Rating
94
Overall Index
2
Overall Quick
Overall Rating
321
Pipe schematic from manhole 18 0308 to 18 0307A
MH: 18 0308MH: 18 0307Adownstream0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 18 03082 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start8.4 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start11.8 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start11.8 ft. MGO - General Observation - MAG COATING THROUGHOUT36.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"84.6 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"141 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"188.9 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 6"236.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish236.5 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish236.5 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish238.4 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK238.4 ft. AMH - Downstream Manhole, Survey Ends - 18 0307A

Observation photos (4)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    8.4 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    11.8 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • General Observation - MAG COATING THROUGHOUT

    11.8 ft. - General Observation - MAG COATING THROUGHOUT

Observations (16)

DistanceCodeObservation
2DAGS
236.5DAGS
236.5SSS
11.8SAP
0MWL
11.8MGOMAG COATING THROUGHOUT
238.4MGOCONNECTION AT MH 3 O'CLOCK
188.9TF
236.5SAP
36.5TFC
8.4SSS
141TFC
238.4AMH18 0307A
0MWM
84.6TFA
0AMH18 0308

Properties (7)

additional_info
630069010421201
custom_field_three
SPALLING/PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2021-01-04T21:45:27-08:00
documentation
PRO PIPE
is_lateral_inspection
false