Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 5, 2021, 06:53 AM
  • 18 0310_18 0309_01042021_230433.mp4

Date
01/04/2021
W/O
865103
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00683
PipeID
P14142
Time
10:53 PM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8402
Sewer Name
18 LA MIRADA TRUNK, SECTS 1&2
City
SANTA FE SPRINGS
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
31
Purpose
Routine Assessment
Project
RFIR_WO_865103_TV18098_DEC2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
18 in.
Width
18 in.
Upstream MH
18 0309
Downstream MH
18 0310
Dir. of Survey
Upstream
Length Surveyed
280.4 ft.
Total Length
280.4 ft.
Structural Index
3
Structural Quick
5J3J
Structural Rating
545
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
545
Pipe schematic from manhole 18 0309 to 18 0310
MH: 18 0309MH: 18 0310upstream0 ft. AMH - Upstream Manhole, Survey Ends - 18 03100 ft. MGO - General Observation - CONNECTION AT MH 9 O'CLOCK2.9 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish2.9 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish2.9 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish53 ft. TF - Tap Factory Made, at 10 o'clock, -, within 8 inches of joint: NO, 6"101.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"149.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"205.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"254.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"271.9 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start278.4 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start278.4 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start280.4 ft. MGO - General Observation - CONNECTIONS IN MH AT BOTH 3 AND 9 O' CLOCK280.4 ft. AMH - Downstream Manhole, Survey Begins - 18 0309

Observation photos (4)

  • General Observation - CONNECTIONS IN MH AT BOTH 3 AND 9 O' CLOCK

    0 ft. - General Observation - CONNECTIONS IN MH AT BOTH 3 AND 9 O' CLOCK

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    8.5 ft. - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (15)

DistanceCodeObservation
227.4TF
74.6TFC
2SSS
277.5SSS
280.4AMH18 0310
178.7TFC
130.9TFC
277.5SRV
8.5SRV
2SAP
0MGOCONNECTIONS IN MH AT BOTH 3 AND 9 O' CLOCK
26.1TFC
0AMH18 0309
277.5SAP
280.4MGOCONNECTION AT MH 9 O'CLOCK

Properties (7)

additional_info
630069010421201
custom_field_three
VISIBLE REINFORCEMENT/PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2021-01-04T22:53:25-08:00
documentation
PRO PIPE
is_lateral_inspection
false