Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 5, 2021, 10:52 AM
  • 18 0300_18 0562_01052021_030707.mp4

Date
01/05/2021
W/O
865103
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00683
PipeID
P14131
Time
2:52 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8402
Sewer Name
18 LA MIRADA TRUNK, SECTS 1&2
City
SANTA FE SPRINGS
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
31
Purpose
Routine Assessment
Project
RFIR_WO_865103_TV18098_DEC2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Width
24 in.
Upstream MH
18 0300
Downstream MH
18 0562
Dir. of Survey
Downstream
Length Surveyed
334.1 ft.
Total Length
334.1 ft.
Structural Index
4
Structural Quick
5B32
Structural Rating
75
O&M Index
2
O&M Quick
2400
O&M Rating
8
Overall Index
4
Overall Quick
Overall Rating
83
Pipe schematic from manhole 18 0300 to 18 0562
MH: 18 0300MH: 18 0562downstream0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 18 03000 ft. MWM - Water Mark, 25 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start5.4 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start5.4 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start37.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"44.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"80.6 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start - DEBRIS85.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"93.6 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"133.7 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"140.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"182.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"189 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"237.2 ft. TFA - Tap Factory Made Active, at 02 o'clock, -, within 8 inches of joint: NO, 6"246.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"257.1 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start301.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 6"310 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 6"324.3 ft. SRV - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish327.9 ft. DSZ - Deposits Settled Other, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish331.2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish331.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish331.2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish334.1 ft. MGO - General Observation - STOP LOG CONNECTION AT MH 12 O'CLOCK334.1 ft. AMH - Downstream Manhole, Survey Ends - 18 0562334.1 ft. MGO - General Observation - COCKROACHES IN MANHOLE

Observation photos (5)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    5.4 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    5.4 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    257.1 ft. - Surface Reinforcement Visible, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES IN MANHOLE

    334.1 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (28)

DistanceCodeObservation
237.2TFA
182.1TFC
301.9TFC
331.2SAP
331.2DAGS
93.6TFC
37.1TFC
0MWL
324.3SRV
0AMH18 0300
44.6TFC
257.1SRV
80.6DSZDEBRIS
189TFC
246.2TFC
334.1MGOSTOP LOG CONNECTION AT MH 12 O'CLOCK
140.7TFC
5.4SSS
5.4SAP
334.1AMH18 0562
310TFC
0MWM
133.7TFA
85.1TFC
334.1MGOCOCKROACHES IN MANHOLE
331.2SSS
2DAGS
327.9DSZ

Properties (7)

additional_info
630069010421201
custom_field_three
VISIBLE REINFORCEMENT/PROJECTING AGGREGATE
custom_field_two
2
customer
1
datetime
2021-01-05T02:52:50-08:00
documentation
PRO PIPE
is_lateral_inspection
false