Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 22, 2021, 08:55 AM
  • 05 0393_05 0280_2222021_010133.mp4

Date
02/22/2021
W/O
0875039
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00498
PipeID
P05489
Time
12:55 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H1727
Sewer Name
05 OAK STREET-CENTER AVENUE TRUNK
City
INGLEWOOD
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
06
Purpose
Capital Improvement Program Assesment
Project
20210217MDM_OAK_STREET_CENTER_AVENUE_TRUNK
Material
Reinforced Concrete Pipe
Shape
Circular
Height
27 in.
Upstream MH
05 0393
Downstream MH
05 0280
Dir. of Survey
Downstream
Length Surveyed
322.8 ft.
Total Length
322.8 ft.
Structural Index
3
Structural Quick
4322
Structural Rating
16
O&M Index
3
O&M Quick
3121
O&M Rating
5
Overall Index
3
Overall Quick
Overall Rating
21
Pipe schematic from manhole 05 0393 to 05 0280
MH: 05 0393MH: 05 0280downstream0 ft. AMH - Upstream Manhole, Survey Begins - 1:10AM0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MGO - General Observation - Conn. @ Mh, 3 O' Clock. Active0 ft. MGO - General Observation - Conn. @ Mh, 9 O' Clock. Active0 ft. MWM - Water Mark, 20 %of cross sectional area2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE2 ft. SAM - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AQGG2 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - PEELING CONCRETE SEVERE AGG ATTACHED37.4 ft. SAM - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG211.4 ft. DAGS - Deposits Attached Grease, 15 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: NO220.9 ft. SAM - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG322.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - BLISTERING PEELING CONCRETE322.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - PEELING CONCRETE SEVERE AGG ATTACHED322.2 ft. SAM - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG322.2 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish322.2 ft. MGO - General Observation - Conn. @ Mh, 3 O' Clock. Active322.2 ft. MGO - General Observation - Conn. @ Mh, 9 O' Clock. Active322.8 ft. AMH - Downstream Manhole, Survey Ends - 1:35AM

Observation photos (7)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE

  • Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AQGG

    2 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AQGG

  • Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - PEELING CONCRETE SEVERE AGG ATTACHED

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - PEELING CONCRETE SEVERE AGG ATTACHED

  • Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG

    37.4 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG

  • Deposits Attached Grease, 15 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: NO

    211.4 ft. - Deposits Attached Grease, 15 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: NO

  • Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG

    220.9 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: NO - SEVERE AGG

Observations (19)

DistanceCodeObservation
322.2SSSBLISTERING PEELING CONCRETE
322.2SSSPEELING CONCRETE SEVERE AGG ATTACHED
0AMH1:10AM
322.2SAMSEVERE AGG
2SSSBLISTERING PEELING CONCRETE
322.8AMH1:35AM
220.9SAMSEVERE AGG
211.4DAGS
2SAMSEVERE AQGG
322.2DAGS
0MWL
0MGOConn. @ Mh, 3 O' Clock. Active
2DAGS
37.4SAMSEVERE AGG
0MGOConn. @ Mh, 9 O' Clock. Active
322.2MGOConn. @ Mh, 3 O' Clock. Active
0MWM
2SSSPEELING CONCRETE SEVERE AGG ATTACHED
322.2MGOConn. @ Mh, 9 O' Clock. Active

Properties (6)

custom_field_three
PEELING CONCRETE SEVERE AGG ATTACHED
custom_field_two
2
customer
LACSD
datetime
2021-02-22T00:55:08-08:00
documentation
MARTIN,OLIVER 111,CASTILLO,RUVALCABA
is_lateral_inspection
false