Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 19, 2021, 10:36 AM
  • 05 0284_05 0283_2192021_024053.mp4

Date
02/19/2021
W/O
0875039
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00498
PipeID
P05492
Time
2:36 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
H1726
Sewer Name
05 OAK STREET-CENTER AVENUE TRUNK
City
INGLEWOOD
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
06
Purpose
Capital Improvement Program Assesment
Project
20210217MDM_OAK_STREET_CENTER_AVENUE_TRUNK
Material
Reinforced Concrete Pipe
Shape
Circular
Height
27 in.
Upstream MH
05 0284
Downstream MH
05 0283
Dir. of Survey
Downstream
Length Surveyed
307.8 ft.
Total Length
307.8 ft.
Structural Index
3
Structural Quick
4122
Structural Rating
8
O&M Index
2
O&M Quick
2100
O&M Rating
2
Overall Index
3
Overall Quick
Overall Rating
10
Pipe schematic from manhole 05 0284 to 05 0283
MH: 05 0284MH: 05 0283downstream0 ft. MGO - General Observation - Conn. @ Mh, 3 O' Clock. Active0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MGO - General Observation - Conn. @ Mh, 9 O' Clock. Active0 ft. AMH - Upstream Manhole, Survey Begins - 2:40AM2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING PEELING CONCRETE2 ft. SAM - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG3.5 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - PEELING CONCRETE SEVERE AGG ATTACHED3.5 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start307.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - BLISTERUNG PEELING CONCRETE307.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish307.2 ft. SAM - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - SEVERE AGG307.2 ft. MGO - General Observation - Conn. @ Mh, 9 O' Clock. Active307.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - PEELING CONCRETE SEVERE AGG ATTACHED307.2 ft. MGO - General Observation - Conn. @ Mh, 3 O' Clock. Active307.8 ft. AMH - Downstream Manhole, Survey Ends - 3:00AM

Observation photos (3)

  • Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

    2 ft. - Surface Aggregate Missing, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - SEVERE AGG

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - PEELING CONCRETE SEVERE AGG ATTACHED

    3.5 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - PEELING CONCRETE SEVERE AGG ATTACHED

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    3.5 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

Observations (16)

DistanceCodeObservation
307.8AMH3:00AM
307.2SSSBLISTERUNG PEELING CONCRETE
307.2DAGS
0MGOConn. @ Mh, 3 O' Clock. Active
0MWM
2SSSBLISTERING PEELING CONCRETE
3.5SSSPEELING CONCRETE SEVERE AGG ATTACHED
307.2SAMSEVERE AGG
0MWL
307.2MGOConn. @ Mh, 9 O' Clock. Active
2SAMSEVERE AGG
0MGOConn. @ Mh, 9 O' Clock. Active
307.2SSSPEELING CONCRETE SEVERE AGG ATTACHED
3.5DAGS
307.2MGOConn. @ Mh, 3 O' Clock. Active
0AMH2:40AM

Properties (6)

custom_field_three
PEELING CONCRETE SEVERE AGG ATTACHED
custom_field_two
2
customer
LACSD
datetime
2021-02-19T02:36:46-08:00
documentation
MARTIN,CASTILLO,RUVALCABA
is_lateral_inspection
false