Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 29, 2021, 08:23 AM
  • 05 2004_05 2003_01292021_004653.mp4

Date
01/29/2021
W/O
870570
Weather
Heavy Rain
Operator/Surveyor
N.ZAHREDDINE
Sewer ID
Z00538
PipeID
P07196
Time
12:23 AM
Certificate
U-109-7948
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8512
Sewer Name
05 WESTERN AVENUE TRUNK
City
RANCHO PALOS VERDES
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 05
Page No.
44
Purpose
Routine Assessment
Project
WO_870570_TV05115_JAN2021
Sewer Type
Gravity
Material
NRCP
Shape
Circular
Height
10 in.
Width
15 in.
Upstream MH
05 2003
Downstream MH
05 2004
Dir. of Survey
Upstream
Length Surveyed
238 ft.
Total Length
238 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
2H00
O&M Rating
94
Overall Index
2
Overall Quick
Overall Rating
94
Pipe schematic from manhole 05 2003 to 05 2004
MH: 05 2003MH: 05 2004upstream0 ft. AMH - Upstream Manhole, Survey Ends - 05 20041 ft. MGO - General Observation - CONN @ MH 3 O'CLOCK/ACTIVE3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Finish173.1 ft. TF - Tap Factory Made, at 02 o'clock, -, within 8 inches of joint: NO, 4" - OPEN207.1 ft. TF - Tap Factory Made, at 03 o'clock, -, within 8 inches of joint: NO, 4" - OPEN236 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start238 ft. MWL - Water Level, 15 %of cross sectional area238 ft. AMH - Downstream Manhole, Survey Begins - 05 2003238 ft. MGO - General Observation - ROACHES @ MH238 ft. MWM - Water Mark, 20 %of cross sectional area

Observations (10)

DistanceCodeObservation
235DAGS
64.9TFOPEN
2DAGS
238AMH05 2004
0MWL
0AMH05 2003
30.9TFOPEN
0MGOROACHES @ MH
0MWM
237MGOCONN @ MH 3 O'CLOCK/ACTIVE

Properties (8)

additional_info
630138012821201
custom_field_three
LIGHT GREASE
custom_field_two
4
customer
1
datetime
2021-01-29T00:23:34-08:00
documentation
PRO PIPE
is_lateral_inspection
false
lining
CIPP