Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 4, 2021, 09:25 AM
  • F 0156_F 0155_02042021_015122.mp4

Date
02/04/2021
W/O
870236
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00043
PipeID
P10290
Time
1:25 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8552
Sewer Name
F JOINT OUTFALL F - UNIT 7A
City
NORWALK
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
37
Purpose
Routine Assessment
Project
RFIR_WO_870236_TV02202_JAN2021
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
51 in.
Width
27 in.
Upstream MH
F 0156
Downstream MH
F 0155
Dir. of Survey
Downstream
Length Surveyed
451.9 ft.
Total Length
451.9 ft.
Structural Index
3
Structural Quick
3Q2Q
Structural Rating
450
O&M Index
2
O&M Quick
2Q00
O&M Rating
180
Overall Index
2
Overall Quick
Overall Rating
630
Pipe schematic from manhole F 0156 to F 0155
MH: F 0156MH: F 0155downstream0 ft. MWL - Water Level, 25 %of cross sectional area0 ft. MWM - Water Mark, 30 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - F 01562 ft. MGO - General Observation - 70% COAT2 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start450.1 ft. SAP - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish450.1 ft. SSS - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish450.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish451.9 ft. AMH - Downstream Manhole, Survey Ends - F 0155

Observation photos (4)

  • General Observation - 70% COAT

    2 ft. - General Observation - 70% COAT

  • Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

Observations (11)

DistanceCodeObservation
450.1SAP
450.1SSS
2MGO70% COAT
2SSS
2SAP
451.9AMHF 0155
2DAGS
450.1DAGS
0MWL
0MWM
0AMHF 0156

Properties (7)

additional_info
630069020321201
custom_field_three
SPALLING/PROJECTING AGGREGATE
custom_field_two
3
customer
1
datetime
2021-02-04T01:25:58-08:00
documentation
PRO PIPE
is_lateral_inspection
false