Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 3, 2021, 09:13 AM
  • 08 0031_08 0030_02032021_013451.mp4

Date
02/03/2021
W/O
870237
Weather
Dry
Operator/Surveyor
J. BUENROSTRO
Sewer ID
Z00016
PipeID
P00033
Time
1:13 AM
Certificate
U-715-07000770
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K7833
Sewer Name
08 MAIN STREET TRUNK
City
GARDENA
Loc. details
Sidewalk
Location Code
F
Use of Sewer
Sanitary Sewer
District
District 08
Page No.
07
Purpose
Routine Assessment
Project
RFIR_WO_870237_TV08115_JAN2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
21 in.
Width
21 in.
Upstream MH
08 0030
Downstream MH
08 0031
Dir. of Survey
Upstream
Length Surveyed
261.9 ft.
Total Length
261.9 ft.
Structural Index
3
Structural Quick
3I2I
Structural Rating
255
O&M Index
2
O&M Quick
2S00
O&M Rating
204
Overall Index
2
Overall Quick
Overall Rating
459
Pipe schematic from manhole 08 0030 to 08 0031
MH: 08 0030MH: 08 0031upstream0 ft. MSA - Survey Abandoned - REVERSAL COMPLETED0.3 ft. MGO - General Observation - END POINT OF D/S SURVEY0.4 ft. DSC - Deposits Settled Compacted, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish0.4 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Finish2.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish2.9 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish2.9 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish18.5 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start89 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 4"170.4 ft. MWL - Water Level, 30 %of cross sectional area187.5 ft. TF - Tap Factory Made, at 12 o'clock, -, within 8 inches of joint: NO, 4" - OPEN233.6 ft. DSC - Deposits Settled Compacted, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start236.4 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 4"259.9 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start259.9 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start259.9 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start261.9 ft. MWL - Water Level, 35 %of cross sectional area261.9 ft. MGO - Reversal Inspection261.9 ft. AMH - Downstream Manhole, Survey Begins - 08 0030261.9 ft. MWM - Water Mark, 40 %of cross sectional area

Observation photos (1)

  • Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES, Start

    243.4 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start

Observations (20)

DistanceCodeObservation
0MWL
91.5MWL
0MGO
0AMH08 0030
261.6MGOEND POINT OF D/S SURVEY
2CM
0MWM
259DAGS
259SSS
2DAGS
261.5DSC
259CM
25.5TFC
172.9TFC
2SSS
261.9MSAREVERSAL COMPLETED
28.3DSC
243.4DAE
74.4TFOPEN
261.5DAE

Properties (7)

additional_info
630138020221201
custom_field_three
BROKEN PIPE
custom_field_two
2
customer
1
datetime
2021-02-03T01:13:58-08:00
documentation
PROPIPE
is_lateral_inspection
false