Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Feb 3, 2021, 10:09 AM
  • 08 0036_08 0035_02032021_022936.mp4

Date
02/03/2021
W/O
870237
Weather
Dry
Operator/Surveyor
J. BUENROSTRO
Sewer ID
Z00016
PipeID
P00038
Time
2:09 AM
Certificate
U-715-07000770
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K7833
Sewer Name
08 MAIN STREET TRUNK
City
GARDENA
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 08
Page No.
04
Purpose
Routine Assessment
Project
RFIR_WO_870237_TV08115_JAN2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
21 in.
Width
21 in.
Upstream MH
08 0036
Downstream MH
08 0035
Dir. of Survey
Downstream
Length Surveyed
320.3 ft.
Total Length
320.3 ft.
Structural Index
3
Structural Quick
443L
Structural Rating
341
O&M Index
2
O&M Quick
2M00
O&M Rating
138
Overall Index
2
Overall Quick
Overall Rating
479
Pipe schematic from manhole 08 0036 to 08 0035
MH: 08 0036MH: 08 0035downstream0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 08 00360 ft. MWL - Water Level, 15 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start32.4 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 4"58.2 ft. FM - Fracture Multiple, from 01 to 09 o'clock, within 8 inches of joint: YES73.6 ft. DSGV - Deposits Settled Gravel, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start82.5 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 4"104.9 ft. DSGV - Deposits Settled Gravel, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Finish115.2 ft. MGO - General Observation - LIGHT STEAM IN SEWER130.6 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 4"184.1 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 4"185.9 ft. CS - Crack Spiral, from 11 to 01 o'clock, within 8 inches of joint: YES, Start188.1 ft. FM - Fracture Multiple, from 07 to 05 o'clock, within 8 inches of joint: YES, Start201.9 ft. CS - Crack Spiral, from 11 to 01 o'clock, within 8 inches of joint: YES, Finish201.9 ft. FM - Fracture Multiple, from 07 to 05 o'clock, within 8 inches of joint: YES, Finish230.1 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 4"250 ft. CL - Crack Longitudinal, at 03 o'clock, within 8 inches of joint: YES267.9 ft. CS - Crack Spiral, from 09 to 11 o'clock, within 8 inches of joint: YES272.6 ft. TFC - Tap Factory Made Capped, at 12 o'clock, -, within 8 inches of joint: NO, 4"318 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish318 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish318 ft. CM - Crack Multiple, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish319 ft. MGO - General Observation - ROACHES @ MH320.3 ft. AMH - Downstream Manhole, Survey Ends - 08 0035

Observation photos (6)

  • Fracture Multiple, from 01 to 09 o'clock, within 8 inches of joint: YES

    58.2 ft. - Fracture Multiple, from 01 to 09 o'clock, within 8 inches of joint: YES

  • Deposits Settled Gravel,  5 %of cross sectional area, from 05 to 07 o'clock,  , within 8 inches of joint: YES, Start

    73.6 ft. - Deposits Settled Gravel, 5 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start

  • Crack Spiral, from 11 to 01 o'clock, within 8 inches of joint: YES, Start

    185.9 ft. - Crack Spiral, from 11 to 01 o'clock, within 8 inches of joint: YES, Start

  • Fracture Multiple, from 07 to 05 o'clock, within 8 inches of joint: YES, Start

    188.1 ft. - Fracture Multiple, from 07 to 05 o'clock, within 8 inches of joint: YES, Start

  • Crack Longitudinal, at 03 o'clock, within 8 inches of joint: YES

    250 ft. - Crack Longitudinal, at 03 o'clock, within 8 inches of joint: YES

  • Crack Spiral, from 09 to 11 o'clock, within 8 inches of joint: YES

    267.9 ft. - Crack Spiral, from 09 to 11 o'clock, within 8 inches of joint: YES

Observations (27)

DistanceCodeObservation
184.1TFC
318DAGS
104.9DSGV
115.2MGOLIGHT STEAM IN SEWER
2DAGS
0MWM
318SSS
250CL
318CM
267.9CS
32.4TFC
188.1FM
82.5TFC
201.9CS
185.9CS
2CM
73.6DSGV
319MGOROACHES @ MH
320.3AMH08 0035
130.6TFC
201.9FM
272.6TFC
58.2FM
230.1TFC
0AMH08 0036
0MWL
2SSS

Properties (7)

additional_info
630138020221201
custom_field_three
MULTIPLE FRACTURES
custom_field_two
2
customer
1
datetime
2021-02-03T02:09:53-08:00
documentation
PROPIPE
is_lateral_inspection
false