Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 19, 2021, 06:06 AM
  • 22 0314_22 0313_01182021_222625.mp4

Date
01/18/2021
W/O
870229
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00794
PipeID
P16601
Time
10:06 PM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8381
Sewer Name
22 CAMERON TRUNK, SECTION 4
City
WEST COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
37
Purpose
Routine Assessment
Project
WO_870229_TV22011_JAN2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
22 0314
Downstream MH
22 0313
Dir. of Survey
Downstream
Length Surveyed
358.8 ft.
Total Length
358.8 ft.
Structural Index
3
Structural Quick
3M2M
Structural Rating
352
O&M Index
2
O&M Quick
2M00
O&M Rating
142
Overall Index
2
Overall Quick
Overall Rating
494
Pipe schematic from manhole 22 0314 to 22 0313
MH: 22 0314MH: 22 0313downstream0 ft. MGO - General Observation - CONN @ MH 9 O'CLOCK/ACTIVE0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 22 03140 ft. MWM - Water Mark, 25 %of cross sectional area2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start4.8 ft. CM - Crack Multiple, from 07 to 05 o'clock, within 8 inches of joint: YES9 ft. CM - Crack Multiple, from 07 to 05 o'clock, within 8 inches of joint: YES, Start10.7 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 8"92.7 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 8" - OPEN118.8 ft. TFC - Tap Factory Made Capped, at 11 o'clock, -, within 8 inches of joint: YES, 8"169.7 ft. TFA - Tap Factory Made Active, at 01 o'clock, -, within 8 inches of joint: YES, 4", 8"203.6 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 8" - OPEN250.5 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 8" - OPEN300.8 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 8" - OPEN305 ft. TB - Tap Break-In, at 01 o'clock, -, within 8 inches of joint: YES, 8" - OPEN315 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 8"355.9 ft. CM - Crack Multiple, from 07 to 05 o'clock, within 8 inches of joint: YES, Finish356 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish356 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish358.8 ft. AMH - Downstream Manhole, Survey Ends - 22 0313

Observation photos (3)

  • Crack Multiple, from 07 to 05 o'clock, within 8 inches of joint: YES

    4.8 ft. - Crack Multiple, from 07 to 05 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 07 to 05 o'clock, within 8 inches of joint: YES, Start

    9 ft. - Crack Multiple, from 07 to 05 o'clock, within 8 inches of joint: YES, Start

  • Tap Break-In, at 01 o'clock, -, within 8 inches of joint: YES, 8" - OPEN

    305 ft. - Tap Break-In, at 01 o'clock, -, within 8 inches of joint: YES, 8" - OPEN

Observations (21)

DistanceCodeObservation
203.6TFOPEN
2DAGS
0MGOCONN @ MH 9 O'CLOCK/ACTIVE
118.8TFC
305TBOPEN
92.7TFOPEN
356DAGS
169.7TFA
2SSS
356SSS
0MWL
0AMH22 0314
10.7TFC
9CM
4.8CM
0MWM
300.8TFOPEN
250.5TFOPEN
315TFC
355.9CM
358.8AMH22 0313

Properties (6)

custom_field_three
MULTIPLE CRACKS
custom_field_two
3
customer
1
datetime
2021-01-18T22:06:46-08:00
documentation
PRO PIPE
is_lateral_inspection
false