Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 19, 2021, 06:50 AM
  • 22 0313_22 0312_01182021_230755.mp4

Date
01/18/2021
W/O
870229
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00794
PipeID
P16600
Time
10:50 PM
Certificate
U-115-06022794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8381
Sewer Name
22 CAMERON TRUNK, SECTION 4
City
WEST COVINA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 22
Page No.
37
Purpose
Routine Assessment
Project
WO_870229_TV22011_JAN2021
Sewer Type
Gravity
Material
Vitrified Clay Pipe
Shape
Circular
Height
12 in.
Width
12 in.
Upstream MH
22 0313
Downstream MH
22 0312
Dir. of Survey
Downstream
Length Surveyed
360.8 ft.
Total Length
360.8 ft.
Structural Index
3
Structural Quick
3M2M
Structural Rating
352
O&M Index
2
O&M Quick
2M00
O&M Rating
142
Overall Index
2
Overall Quick
Overall Rating
494
Pipe schematic from manhole 22 0313 to 22 0312
MH: 22 0313MH: 22 0312downstream0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 25 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 22 03132 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start7.6 ft. CM - Crack Multiple, from 07 to 05 o'clock, within 8 inches of joint: YES, Start37.7 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 8" - OPEN48.1 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 8" - OPEN80.2 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 8" - OPEN118 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 8"156.1 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 8" - OPEN162.4 ft. TB - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 8" - OPEN202.2 ft. TFC - Tap Factory Made Capped, at 01 o'clock, -, within 8 inches of joint: YES, 8"224.7 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 8" - OPEN282.7 ft. TF - Tap Factory Made, at 01 o'clock, -, within 8 inches of joint: YES, 8" - OPEN332.8 ft. TF - Tap Factory Made, at 11 o'clock, -, within 8 inches of joint: YES, 8" - OPEN357.4 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish357.4 ft. CM - Crack Multiple, from 07 to 05 o'clock, within 8 inches of joint: YES, Finish358 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish360.8 ft. AMH - Downstream Manhole, Survey Ends - 22 0312

Observation photos (4)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Crack Multiple, from 07 to 05 o'clock, within 8 inches of joint: YES, Start

    7.6 ft. - Crack Multiple, from 07 to 05 o'clock, within 8 inches of joint: YES, Start

  • Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 8" - OPEN

    80.2 ft. - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 8" - OPEN

  • Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 8" - OPEN

    162.4 ft. - Tap Break-In, at 02 o'clock, -, within 8 inches of joint: YES, 8" - OPEN

Observations (20)

DistanceCodeObservation
357.4DAGS
282.7TFOPEN
0MWL
360.8AMH22 0312
162.4TBOPEN
224.7TFOPEN
2SSS
156.1TFOPEN
202.2TFC
118TFC
332.8TFOPEN
357.4CM
48.1TFOPEN
2DAGS
0MWM
7.6CM
80.2TBOPEN
37.7TFOPEN
358SSS
0AMH22 0313

Properties (6)

custom_field_three
MULTIPLE CRACKS
custom_field_two
3
customer
1
datetime
2021-01-18T22:50:06-08:00
documentation
PRO PIPE
is_lateral_inspection
false