Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 14, 2021, 11:35 AM
  • H 0946_H 0945_01142021_034325.mp4

Date
01/14/2021
W/O
865007
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z01005
PipeID
P15359
Time
3:35 AM
Certificate
U-115-06002794
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8378
Sewer Name
H JOINT OUTFALL H - UNIT 7C
City
CITY OF INDUSTRY
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 21
Page No.
33
Purpose
Routine Assessment
Project
WO_865007_TV21022_DEC2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
36 in.
Width
36 in.
Upstream MH
H 0945
Downstream MH
H 0946
Dir. of Survey
Upstream
Length Surveyed
10.2 ft.
Total Length
10.2 ft.
Structural Index
3
Structural Quick
3222
Structural Rating
10
O&M Index
2
O&M Quick
2300
O&M Rating
6
Overall Index
2
Overall Quick
Overall Rating
16
Pipe schematic from manhole H 0945 to H 0946
MH: H 0945MH: H 0946upstream0 ft. MSA - Survey Abandoned - UNABLE TO GET PAST DEBRIS/PIPE MATERIAL0 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish0 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish2.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish2.8 ft. OBM - Obstacles Pipe Material, 10 %of cross sectional area, at 06 o'clock8.2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start8.2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start8.2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start8.2 ft. MGO - General Observation - MAG COAT10.2 ft. MWL - Water Level, 10 %of cross sectional area10.2 ft. AMH - Downstream Manhole, Survey Begins - H 094510.2 ft. MWM - Water Mark, 25 %of cross sectional area

Observation photos (5)

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • General Observation - MAG COAT

    2 ft. - General Observation - MAG COAT

  • Obstacles Pipe Material, 10 %of cross sectional area, at 06 o'clock

    7.4 ft. - Obstacles Pipe Material, 10 %of cross sectional area, at 06 o'clock

  • Survey Abandoned - UNABLE TO GET PAST DEBRIS/PIPE MATERIAL

    10.2 ft. - Survey Abandoned - UNABLE TO GET PAST DEBRIS/PIPE MATERIAL

Observations (12)

DistanceCodeObservation
0MWL
0AMHH 0945
10.2MSAUNABLE TO GET PAST DEBRIS/PIPE MATERIAL
10.2SAP
10.2SSS
7.4OBM
2SSS
0MWM
2DAGS
8DAGS
2SAP
2MGOMAG COAT

Properties (6)

custom_field_three
AGGREGATE PROJECTING, SPALLING
custom_field_two
5
customer
1
datetime
2021-01-14T03:35:38-08:00
documentation
PRO PIPE
is_lateral_inspection
false