Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 14, 2021, 06:31 PM
  • H 0941_H 0940_01142021_104508.mp4

Date
01/14/2021
W/O
865007
Weather
Dry
Operator/Surveyor
N.ZAHREDDINE
Sewer ID
Z01005
PipeID
P15354
Time
10:31 AM
Certificate
U-109-7948
System Owner
1
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K8099
Sewer Name
H JOINT OUTFALL H - UNIT 7C
City
CITY OF INDUSTRY
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 21
Page No.
33
Purpose
Routine Assessment
Project
WO_865007_TV21022_DEC2020
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
33 in.
Width
33 in.
Upstream MH
H 0941
Downstream MH
H 0940
Dir. of Survey
Downstream
Length Surveyed
463.2 ft.
Total Length
463.2 ft.
Structural Index
3
Structural Quick
3Q2Q
Structural Rating
460
O&M Index
2
O&M Quick
2d00
O&M Rating
366
Overall Index
2
Overall Quick
Overall Rating
826
Pipe schematic from manhole H 0941 to H 0940
MH: H 0941MH: H 0940downstream0 ft. AMH - Upstream Manhole, Survey Begins - H 09410 ft. MWL - Water Level, 20 %of cross sectional area0 ft. MWM - Water Mark, 25 %of cross sectional area2 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2 ft. MGO - General Observation - 70% MAG COAT2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start2 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start457.8 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish461 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish461 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish461 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish463.2 ft. AMH - Downstream Manhole, Survey Ends - H 0940

Observations (13)

DistanceCodeObservation
2SSS
0AMHH 0941
463.2AMHH 0940
2MGO70% MAG COAT
461DAGS
461SAV
2DAGS
461SSS
2DAGS
0MWL
2SAV
0MWM
457.8DAGS

Properties (7)

additional_info
630138011421061
custom_field_three
LIGHT GREASE
custom_field_two
3
customer
1
datetime
2021-01-14T10:31:20-08:00
documentation
PRO PIPE
is_lateral_inspection
false