H 0946_H 0945_01142021_030832.mp4
2 ft. - General Observation - 65% MAG COAT
2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
121.2 ft. - Alignment Left, 30 %, Start
152.8 ft. - Obstacles Pipe Material, 15 %of cross sectional area, at 06 o'clock
371.1 ft. - Deposits Settled Fine, 10 %of cross sectional area, from 05 to 07 o'clock, , within 8 inches of joint: YES, Start
393.1 ft. - Survey Abandoned - DUE TO SLUDGE
| Distance | Code | Observation |
|---|---|---|
| 121.2 | LL | — |
| 391 | DAGS | — |
| 0 | MWL | — |
| 0 | MWM | — |
| 152.8 | OBM | — |
| 393.1 | SAP | — |
| 0 | AMH | H 0946 |
| 2 | MGO | 65% MAG COAT |
| 2 | SAP | — |
| 393.1 | MSA | DUE TO SLUDGE |
| 371.1 | DSF | — |
| 141.3 | LL | — |
| 393.1 | SSS | — |
| 2 | SSS | — |
| 393.1 | DSF | — |
| 2 | DAGS | — |