Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 25, 2021, 10:17 AM
  • 02 0564_02 0563_01252021_023043.mp4

Date
01/25/2021
W/O
864827
Weather
Dry
Operator/Surveyor
S. LOPEZ
Sewer ID
Z00244
PipeID
P02883
Time
2:17 AM
Certificate
U-0720-70309212
System Owner
1
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K8430
Sewer Name
02 DISTRICT #2 MAIN TRUNK
City
COMMERCE
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 02
Page No.
17
Purpose
Routine Assessment
Project
WO_864827_TV02091_DEC2020
Sewer Type
Gravity
Material
RCP-CTL
Shape
Circular
Height
33 in.
Width
42 in.
Upstream MH
02 0564
Downstream MH
02 0563
Dir. of Survey
Downstream
Length Surveyed
380 ft.
Total Length
380 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
2N00
O&M Rating
150
Overall Index
2
Overall Quick
Overall Rating
150
Pipe schematic from manhole 02 0564 to 02 0563
MH: 02 0564MH: 02 0563downstream0 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK0 ft. MWL - Water Level, 20 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 02 05640 ft. MWM - Water Mark, 35 %of cross sectional area2 ft. MGO - General Observation - MAG COATING THROUGHOUT2 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start182.8 ft. TBA - Tap Break-In Active, at 12 o'clock, -, within 8 inches of joint: YES, 6"288.1 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: YES, 6"378.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish380 ft. MGO - General Observation - CONNECTION AT MH 3 O'CLOCK380 ft. AMH - Downstream Manhole, Survey Ends - 02 0563380 ft. MGO - General Observation - COCKROACHES IN MANHOLE

Observation photos (3)

  • General Observation - MAG COATING THROUGHOUT

    2 ft. - General Observation - MAG COATING THROUGHOUT

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • General Observation - COCKROACHES IN MANHOLE

    380 ft. - General Observation - COCKROACHES IN MANHOLE

Observations (12)

DistanceCodeObservation
0MGOCONNECTION AT MH 3 O'CLOCK
0MWL
288.1TBA
378.3DAGS
0AMH02 0564
2MGOMAG COATING THROUGHOUT
0MWM
380MGOCONNECTION AT MH 3 O'CLOCK
380AMH02 0563
380MGOCOCKROACHES IN MANHOLE
2DAGS
182.8TBA

Properties (7)

additional_info
630069012521001
custom_field_three
MAG COATING
custom_field_two
5
customer
1
datetime
2021-01-25T02:17:55-08:00
documentation
PRO PIPE
is_lateral_inspection
false