Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Oct 26, 2016, 09:45 AM
  • E 0046A_E 0046_20161026_024941.mp4

Date
10/26/2016
W/O
597393
Weather
Dry
Operator/Surveyor
R.VARGAS
Sewer ID
Z00028
PipeID
P11274
Time
2:45 AM
Certificate
U-209-211
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K3863
Sewer Name
E JOINT OUTFALL E - UNIT 2
City
COMPTON
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
16
Purpose
Routine Assessment
Project
WO_597393_TV01124_OCT2016
Sewer Type
Gravity
Material
Reinforced Concrete Pipe
Shape
Circular
Height
48 in.
Width
48 in.
Upstream MH
E 0046A
Downstream MH
E 0046
Dir. of Survey
Downstream
Length Surveyed
7.9 ft.
Total Length
7.9 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
4
O&M Quick
4131
O&M Rating
7
Overall Index
3
Overall Quick
Overall Rating
10
Pipe schematic from manhole E 0046A to E 0046
MH: E 0046AMH: E 0046downstream0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - E 0046A0 ft. MWM - Water Mark, 20 %of cross sectional area0 ft. MGO - General Observation - LATERAL AT MH 9 OCLOCK ACTIVE2.2 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.3 ft. MGO - General Observation - MAGNESIUM COATING START7.6 ft. OBN - Obstacles Construction Debris, 20 %of cross sectional area, from 04 to 08 o'clock7.9 ft. OBN - Obstacles Construction Debris, 30 %of cross sectional area, from 04 to 08 o'clock7.9 ft. MSA - Survey Abandoned - SEVERE DEBRIS 30%7.9 ft. MGO - General Observation - MAGNESIUM COATING FINISH7.9 ft. SAP - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observation photos (5)

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

    2.2 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start

  • Obstacles Construction Debris, 20 %of cross sectional area, from 04 to 08 o'clock

    7.6 ft. - Obstacles Construction Debris, 20 %of cross sectional area, from 04 to 08 o'clock

  • Obstacles Construction Debris, 30 %of cross sectional area, from 04 to 08 o'clock

    7.9 ft. - Obstacles Construction Debris, 30 %of cross sectional area, from 04 to 08 o'clock

  • Survey Abandoned - SEVERE DEBRIS 30%

    7.9 ft. - Survey Abandoned - SEVERE DEBRIS 30%

  • Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

    7.9 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish

Observations (11)

DistanceCodeObservation
0MWL
0AMHE 0046A
2.2SAP
7.6OBN
0MWM
7.9OBN
7.9MSASEVERE DEBRIS 30%
7.9MGOMAGNESIUM COATING FINISH
7.9SAP
0MGOLATERAL AT MH 9 OCLOCK ACTIVE
2.3MGOMAGNESIUM COATING START

Properties (6)

additional_info
SC301942
custom_field_two
4
customer
LACSD
datetime
2016-10-26T02:45:00-07:00
documentation
PRO PIPE
is_lateral_inspection
false