Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Oct 14, 2017, 12:10 PM
  • Section#3_04 0013_04 0012__10142017__G6854.mp4

Date
10/14/2017
W/O
0630073
Weather
Dry
Operator/Surveyor
MARTIN
Sewer ID
Z00408
PipeID
P11741
Time
5:10 AM
Certificate
U-1014-06022543
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G6854
Sewer Name
04 DISTRICT #4 OUTFALL TRUNK
City
BEVERLY HILLS
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 04
Page No.
03
Purpose
Routine Assessment
Project
20171014MDM_DISTRICT_4_0UTFALL_TRUNK
Material
Reinforced Concrete Pipe
Shape
Circular
Height
27 in.
Upstream MH
04 0013
Downstream MH
04 0012
Dir. of Survey
Downstream
Length Surveyed
588 ft.
Total Length
588 ft.
Structural Index
2
Structural Quick
2W00
Structural Rating
240
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
2
Overall Quick
Overall Rating
240
Pipe schematic from manhole 04 0013 to 04 0012
MH: 04 0013MH: 04 0012downstream0 ft. AMH - Upstream Manhole, Survey Begins - 6:25AM0 ft. MWL - Water Level, 10 %of cross sectional area0 ft. MWM - Water Mark, 20 %of cross sectional area2 ft. MGO - General Observation - MAG COAT 80% START 8:00 TO 4:002 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING& PEELING LAITANCE COAT121.5 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING PEELING LAITANCE COAT139.1 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO153.8 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES587.5 ft. SSS - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish - BLISTERING PEELING LAITANCE COAT587.5 ft. MGO - General Observation - MAG COAT 80% FINISH588 ft. AMH - Downstream Manhole, Survey Ends - 7:00AM

Observation photos (5)

  • General Observation - MAG COAT 80% START 8:00 TO 4:00

    2 ft. - General Observation - MAG COAT 80% START 8:00 TO 4:00

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING& PEELING LAITANCE COAT

    2 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES, Start - BLISTERING& PEELING LAITANCE COAT

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING PEELING LAITANCE COAT

    121.5 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO - BLISTERING PEELING LAITANCE COAT

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO

    139.1 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: NO

  • Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES

    153.8 ft. - Surface Spalling, from 08 to 04 o'clock, within 8 inches of joint: YES

Observations (11)

DistanceCodeObservation
0AMH6:25AM
139.1SSS
2MGOMAG COAT 80% START 8:00 TO 4:00
153.8SSS
0MWL
587.5SSSBLISTERING PEELING LAITANCE COAT
588AMH7:00AM
587.5MGOMAG COAT 80% FINISH
2SSSBLISTERING& PEELING LAITANCE COAT
0MWM
121.5SSSBLISTERING PEELING LAITANCE COAT

Properties (6)

custom_field_three
SPALLING BLISTERING LAITANCE COAT
custom_field_two
4
customer
LACSD
datetime
2017-10-14T05:10:05-07:00
documentation
MARTIN,MANANES,OLIVER 111
is_lateral_inspection
false