C 0383_C 0382_20160223_015843.mp4
2 ft. - General Observation - MAGNESIUM H.O. START
3.2 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start
26 ft. - Infiltration Dripper, at 12 o'clock, within 8 inches of joint: YES
33.5 ft. - Infiltration Gusher, at 03 o'clock, within 8 inches of joint: YES
300 ft. - Surface Aggregate Projecting, from 08 to 04 o'clock, within 8 inches of joint: YES, Start
354 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish
| Distance | Code | Observation |
|---|---|---|
| 154 | IS | — |
| 3.2 | DAGS | — |
| 354 | SAP | — |
| 0 | MWL | — |
| 0 | AMH | C 0383 |
| 358.4 | MGO | LATERAL AT MH 9 OCLOCK |
| 300 | SAP | — |
| 33.5 | IG | — |
| 299.6 | IS | — |
| 0 | MWM | — |
| 358.5 | AMH | C 0382 |
| 49.7 | IG | — |
| 2 | MGO | MAGNESIUM H.O. START |
| 354 | DAGS | — |
| 26 | ID | — |