Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Jan 12, 2016, 08:38 AM
  • 18 0456_18 0455_20160112_015702_.mp4

Date
01/12/2016
W/O
547052
Weather
Dry
Operator/Surveyor
R.VARGAS
Sewer ID
Z00691
PipeID
P14308
Time
12:38 AM
Certificate
U-209-211
System Owner
LACSD
Date Cleaned
Pre-Cleaning
No Pre-Cleaning
Media Label
K3033
Sewer Name
18 NORTH PLANT OUTFALL TRUNK
City
WHITTIER
Loc. details
Main Highway - Urban
Location Code
A
Use of Sewer
Sanitary Sewer
District
District 18
Page No.
21
Purpose
Routine Assessment
Project
RFIR_WO_547052_TV18140_JAN2016
Sewer Type
GRAVITY
Material
Reinforced Concrete Pipe
Shape
Circular
Height
24 in.
Upstream MH
18 0456
Downstream MH
18 0455
Dir. of Survey
Downstream
Length Surveyed
471.2 ft.
Total Length
471.2 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
1
O&M Quick
2112
O&M Rating
4
Overall Index
2
Overall Quick
Overall Rating
7
Pipe schematic from manhole 18 0456 to 18 0455
MH: 18 0456MH: 18 0455downstream0 ft. VC - Vermin Cockroach0 ft. AMH - Upstream Manhole, Survey Begins - 18 04560 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MWM - Water Mark, 20 %of cross sectional area2.1 ft. MGO - General Observation - MAGNESIUM H.O. START2.1 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Start2.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start227.6 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 6"271.8 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 6"422.1 ft. TFA - Tap Factory Made Active, at 10 o'clock, -, within 8 inches of joint: YES, 6"466.1 ft. MMC - Material Change, Vitrified clay pipe466.1 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES, Finish466.1 ft. MGO - General Observation - MAGNESIUM H.O. FINISH468.8 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish468.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"471.2 ft. AMH - Downstream Manhole, Survey Ends - 18 0455471.2 ft. VC - Vermin Cockroach471.2 ft. MGO - General Observation - LATERAL AT MH 9 O'CLOCK ACTIVE

Observation photos (2)

  • General Observation - MAGNESIUM H.O. START

    2.1 ft. - General Observation - MAGNESIUM H.O. START

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    2.1 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

Observations (18)

DistanceCodeObservation
0VC
466.1MMC
422.1TFA
468.8DAGS
471.2AMH18 0455
2.1MGOMAGNESIUM H.O. START
466.1SAV
2.1SAV
2.1DAGS
271.8TFA
0AMH18 0456
0MWL
466.1MGOMAGNESIUM H.O. FINISH
471.2VC
471.2MGOLATERAL AT MH 9 O'CLOCK ACTIVE
227.6TFA
468.8TFC
0MWM

Properties (6)

additional_info
SC224627
custom_field_two
3
customer
LACSD
datetime
2016-01-12T00:38:48-08:00
documentation
PRO PIPE
is_lateral_inspection
false