Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0May 23, 2017, 05:51 PM
  • A 0326_A 0325_5232017_110715.mp4

Date
05/23/2017
W/O
0640653
Weather
Dry
Operator/Surveyor
IGNACIO
Sewer ID
Z00325
PipeID
P08236
Time
10:51 AM
Certificate
PENDING
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
G7413
Sewer Name
A JOA-1A SAN JOSE CREEK WRP INTERCEPTOR
City
EL MONTE
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 15
Page No.
22
Purpose
Capital Improvement Program Assesment
Project
20170523MI_JOA_1A_SAN_JOSE_CREEK_WRP_INTERCEPTOR
Material
Reinforced Concrete Pipe
Shape
Circular
Height
60 in.
Upstream MH
A 0325
Downstream MH
A 0326
Dir. of Survey
Upstream
Length Surveyed
2.5 ft.
Total Length
2.5 ft.
Structural Index
3
Structural Quick
3100
Structural Rating
3
O&M Index
4
O&M Quick
4100
O&M Rating
4
Overall Index
4
Overall Quick
Overall Rating
7
Pipe schematic from manhole A 0325 to A 0326
MH: A 0325MH: A 0326upstream0 ft. SAV - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES0 ft. MSA - Survey Abandoned - VIEW OF UPLEG PIPE OF THE D/S SIPHON0 ft. MGO - General Observation - MAG COAT, 8 TO 4 OCLOCK, 40% INTACT0 ft. MGO - General Observation - VIEW OF THE UPLEG PIPE OF THE D/S SIPHON0.5 ft. LU - Alignment Up, 45 %2.5 ft. MWL - Water Level, 100 %of cross sectional area2.5 ft. AMH - Downstream Manhole, Survey Begins - 11:30 AM

Observation photos (3)

  • Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES

    2.5 ft. - Surface Aggregate Visible, from 08 to 04 o'clock, within 8 inches of joint: YES

  • General Observation - MAG COAT, 8 TO 4 OCLOCK, 40% INTACT

    2.5 ft. - General Observation - MAG COAT, 8 TO 4 OCLOCK, 40% INTACT

  • General Observation - VIEW OF THE UPLEG PIPE OF THE D/S SIPHON

    2.5 ft. - General Observation - VIEW OF THE UPLEG PIPE OF THE D/S SIPHON

Observations (7)

DistanceCodeObservation
2.5SAV
2LU
0MWL
2.5MSAVIEW OF UPLEG PIPE OF THE D/S SIPHON
0AMH11:30 AM
2.5MGOMAG COAT, 8 TO 4 OCLOCK, 40% INTACT
2.5MGOVIEW OF THE UPLEG PIPE OF THE D/S SIPHON

Properties (6)

additional_info
VIEW OF THE UPLEG PIPE OF THE D/S SIPHON
custom_field_two
3
customer
LACSD
datetime
2017-05-23T10:51:12-07:00
documentation
IGNACIO, FRANKLIN, OBREGON
is_lateral_inspection
false