Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 10, 2016, 10:52 AM
  • 19 0054_19 0053_20160310_035654.mp4

Date
03/10/2016
W/O
557873
Weather
Dry
Operator/Surveyor
J. HARTOOG
Sewer ID
Z00724
PipeID
P15085
Time
2:52 AM
Certificate
U507-03-3386
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K3221
Sewer Name
19 ELAINE AVENUE TRUNK
City
LAKEWOOD, CA
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 19
Page No.
06
Purpose
V
Project
WO_557873_TV19004_2016MAR
Sewer Type
GRAVITY
Material
Vitrified Clay Pipe
Shape
Circular
Height
21 in.
Upstream MH
19 0053
Downstream MH
19 0054
Dir. of Survey
Upstream
Length Surveyed
31.7 ft.
Total Length
31.7 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
2400
O&M Rating
8
Overall Index
2
Overall Quick
Overall Rating
8
Pipe schematic from manhole 19 0053 to 19 0054
MH: 19 0053MH: 19 0054upstream0 ft. MSA - Survey Abandoned - REVERSAL COMPLETE0 ft. MGO - General Observation - HEAVY MINERAL DEPOSITS AT LATERAL0.1 ft. DAE - Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Finish3.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4" - W/ MINERAL DEPOSITS19 ft. DAE - Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start31.7 ft. MWM - Water Mark, 25 %of cross sectional area31.7 ft. AMH - Downstream Manhole, Survey Begins - 19 005331.7 ft. MWL - Water Level, 10 %of cross sectional area31.7 ft. MGO - Reversal Inspection

Observation photos (1)

  • Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES, Start

    12.7 ft. - Deposits Attached Encrustation, 10 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start

Observations (9)

DistanceCodeObservation
31.6DAE
31.7MSAREVERSAL COMPLETE
0MWM
31.7MGOHEAVY MINERAL DEPOSITS AT LATERAL
27.8TFCW/ MINERAL DEPOSITS
12.7DAE
0AMH19 0053
0MWL
0MGO

Properties (6)

additional_info
SC305311
custom_field_two
4
customer
LACSD
datetime
2016-03-10T02:52:31-08:00
documentation
PRO-PIPE
is_lateral_inspection
false