Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 10, 2016, 11:44 AM
  • 19 0045_19 0044_20160310_050251.mp4

Date
03/10/2016
W/O
557873
Weather
Dry
Operator/Surveyor
J. HARTOOG
Sewer ID
Z00724
PipeID
P15075
Time
3:44 AM
Certificate
U507-03-3386
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K3221
Sewer Name
19 ELAINE AVENUE TRUNK
City
LAKEWOOD, CA
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 19
Page No.
09
Purpose
Routine Assessment
Project
WO_557873_TV19004_2016MAR
Sewer Type
GRAVITY
Material
Vitrified Clay Pipe
Shape
Circular
Height
21 in.
Upstream MH
19 0045
Downstream MH
19 0044
Dir. of Survey
Downstream
Length Surveyed
390.5 ft.
Total Length
390.5 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
2
O&M Quick
412V
O&M Rating
230
Overall Index
2
Overall Quick
Overall Rating
230
Pipe schematic from manhole 19 0045 to 19 0044
MH: 19 0045MH: 19 0044downstream0 ft. MGO - General Observation - CAPPED LATERAL 9 O'CLOCK @ MH0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. MGO - General Observation - CAPPED LATERAL 3 O'CLOCK @ MH0 ft. AMH - Upstream Manhole, Survey Begins - 19 00454.3 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: NO, Start7.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"10.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"56 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"60.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"104.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"107.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"151.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"156.4 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"170 ft. IR - Infiltration Runner, at 02 o'clock, within 8 inches of joint: YES200.4 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"204.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"205.5 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start256.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"261.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4" - W/ MINERAL DEPOSITS302.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"305.8 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"353.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"357.6 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"383.9 ft. DAE - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Finish387 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: NO, Finish390.5 ft. MGO - General Observation - CAPPED LATERAL 3 O'CLOCK @ MH390.5 ft. AMH - Downstream Manhole, Survey Ends - 19 0044390.5 ft. MGO - General Observation - CAPPED LATERAL 9 O'CLOCK @ MH

Observation photos (4)

  • Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: NO, Start

    4.3 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: NO, Start

  • Infiltration Runner, at 02 o'clock, within 8 inches of joint: YES

    170 ft. - Infiltration Runner, at 02 o'clock, within 8 inches of joint: YES

  • Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES, Start

    205.5 ft. - Deposits Attached Encrustation, 5 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start

  • Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4" - W/ MINERAL DEPOSITS

    261.6 ft. - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4" - W/ MINERAL DEPOSITS

Observations (29)

DistanceCodeObservation
390.5MGOCAPPED LATERAL 3 O'CLOCK @ MH
4.3DAGS
387DAGS
200.4TFC
353.9TFC
390.5AMH19 0044
302.3TFC
0MGOCAPPED LATERAL 9 O'CLOCK @ MH
0MWL
305.8TFC
156.4TFC
357.6TFC
204.6TFC
383.9DAE
7.5TFC
107.3TFC
205.5DAE
10.8TFC
261.6TFCW/ MINERAL DEPOSITS
151.9TFC
0MWM
170IR
104.8TFC
256.8TFC
56TFC
390.5MGOCAPPED LATERAL 9 O'CLOCK @ MH
0MGOCAPPED LATERAL 3 O'CLOCK @ MH
60.4TFC
0AMH19 0045

Properties (6)

additional_info
SC305311
custom_field_two
4
customer
LACSD
datetime
2016-03-10T03:44:38-08:00
documentation
PRO-PIPE
is_lateral_inspection
false