Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 10, 2016, 09:00 AM
  • 19 0046_19 0045_20160310_044346.mp4

Date
03/10/2016
W/O
557873
Weather
Dry
Operator/Surveyor
J. HARTOOG
Sewer ID
Z00724
PipeID
P15076
Time
1:00 AM
Certificate
U507-03-3386
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K3221
Sewer Name
19 ELAINE AVENUE TRUNK
City
LAKEWOOD, CA
Loc. details
Easement/Right of Way
Location Code
D
Use of Sewer
Sanitary Sewer
District
District 19
Page No.
09
Purpose
Routine Assessment
Project
WO_557873_TV19004_2016MAR
Sewer Type
GRAVITY
Material
Vitrified Clay Pipe
Shape
Circular
Height
21 in.
Upstream MH
19 0046
Downstream MH
19 0045
Dir. of Survey
Downstream
Length Surveyed
394.5 ft.
Total Length
394.5 ft.
Structural Index
2
Structural Quick
2611
Structural Rating
13
O&M Index
2
O&M Quick
2P00
O&M Rating
166
Overall Index
2
Overall Quick
Overall Rating
179
Pipe schematic from manhole 19 0046 to 19 0045
MH: 19 0046MH: 19 0045downstream0 ft. MWL - Water Level, 15 %of cross sectional area0 ft. MWM - Water Mark, 35 %of cross sectional area0 ft. MGO - General Observation - LATERAL AT MH 9 OCLOCK0 ft. AMH - Upstream Manhole, Survey Begins - 19 00460 ft. MGO - General Observation - LATERAL AT MH 3 OCLOCK7 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start18.8 ft. TBC - Tap Break-In Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"24.4 ft. TBC - Tap Break-In Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"69.7 ft. CC - Crack Circumferential, from 09 to 02 o'clock, within 8 inches of joint: YES71.3 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"76 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"119.5 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"123.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"152.1 ft. CL - Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Start167.4 ft. TBC - Tap Break-In Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"171.7 ft. TBC - Tap Break-In Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"183.1 ft. CL - Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Finish217.9 ft. TBC - Tap Break-In Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"221.6 ft. TBC - Tap Break-In Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"270.2 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"274.3 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: YES, 4"318.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"322.9 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"361.8 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"366.5 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4" - W/ MINERAL DEPOSITS391.1 ft. DAGS - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish394.4 ft. MGO - General Observation - LATERAL AT MH 3 OCLOCK394.4 ft. MGO - General Observation - LATERAL AT MH 9 OCLOCK394.5 ft. AMH - Downstream Manhole, Survey Ends - 19 0045

Observation photos (5)

  • Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    7 ft. - Deposits Attached Grease, 5 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • Crack Circumferential, from 09 to 02 o'clock, within 8 inches of joint: YES

    69.7 ft. - Crack Circumferential, from 09 to 02 o'clock, within 8 inches of joint: YES

  • Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Start

    152.1 ft. - Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Start

  • Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Finish

    183.1 ft. - Crack Longitudinal, at 12 o'clock, within 8 inches of joint: YES, Finish

  • Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4" - W/ MINERAL DEPOSITS

    366.5 ft. - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4" - W/ MINERAL DEPOSITS

Observations (29)

DistanceCodeObservation
171.7TBC
71.3TFC
361.8TFC
0MWL
322.9TFC
183.1CL
318.8TFC
394.5AMH19 0045
0MWM
394.4MGOLATERAL AT MH 3 OCLOCK
119.5TFC
0MGOLATERAL AT MH 9 OCLOCK
69.7CC
217.9TBC
0AMH19 0046
167.4TBC
18.8TBC
270.2TFC
152.1CL
0MGOLATERAL AT MH 3 OCLOCK
366.5TFCW/ MINERAL DEPOSITS
123.5TFC
24.4TBC
274.3TFC
221.6TBC
394.4MGOLATERAL AT MH 9 OCLOCK
76TFC
7DAGS
391.1DAGS

Properties (6)

additional_info
SC305311
custom_field_two
3
customer
LACSD
datetime
2016-03-10T01:00:00-08:00
documentation
PRO-PIPE
is_lateral_inspection
false