Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 3, 2016, 07:17 AM
  • 29 0332_29 0321_20160303_003234.mp4

Date
03/02/2016
W/O
557696
Weather
Dry
Operator/Surveyor
J. HARTOOG
Sewer ID
Z01017
PipeID
P24351
Time
11:17 PM
Certificate
U507-03-3386
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K3216
Sewer Name
29 PACIFIC COAST HIGHWAY SEWER
City
SIGNAL HILL
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 29
Page No.
03
Purpose
Routine Assessment
Project
WO_557696_TV29045_2016MAR
Sewer Type
GRAVITY
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Upstream MH
29 0332
Downstream MH
29 0321
Dir. of Survey
Downstream
Length Surveyed
298 ft.
Total Length
298 ft.
Structural Index
2
Structural Quick
3128
Structural Rating
19
O&M Index
2
O&M Quick
2811
O&M Rating
17
Overall Index
2
Overall Quick
Overall Rating
36
Pipe schematic from manhole 29 0332 to 29 0321
MH: 29 0332MH: 29 0321downstream0 ft. AMH - Upstream Manhole, Survey Begins - 29 03320 ft. MWL - Water Level, 5 %of cross sectional area0 ft. VC - Vermin Cockroach0 ft. MWM - Water Mark, 10 %of cross sectional area13.1 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"16.9 ft. TF - Tap Factory Made, at 09 o'clock, -, within 8 inches of joint: NO, 4"67.5 ft. TF - Tap Factory Made, at 09 o'clock, -, within 8 inches of joint: NO, 4"71 ft. TFC - Tap Factory Made Capped, at 03 o'clock, -, within 8 inches of joint: NO, 4"108.8 ft. TF - Tap Factory Made, at 03 o'clock, -, within 8 inches of joint: NO, 4"111.8 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: NO, 4"246.7 ft. MWLS - Water Level, Sag in pipe, 5 %of cross sectional area, Start246.7 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start284.5 ft. MWLS - Water Level, Sag in pipe, 5 %of cross sectional area, Finish284.5 ft. DAGS - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish286.4 ft. CM - Crack Multiple, from 03 to 05 o'clock, within 8 inches of joint: YES298 ft. AMH - Downstream Manhole, Survey Ends - 29 0321

Observation photos (2)

  • Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    246.7 ft. - Deposits Attached Grease, 10 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

  • Crack Multiple, from 03 to 05 o'clock, within 8 inches of joint: YES

    286.4 ft. - Crack Multiple, from 03 to 05 o'clock, within 8 inches of joint: YES

Observations (16)

DistanceCodeObservation
111.8TFC
0AMH29 0332
71TFC
246.7MWLS
286.4CM
67.5TF
108.8TF
0MWL
298AMH29 0321
0VC
284.5MWLS
16.9TF
13.1TFC
0MWM
246.7DAGS
284.5DAGS

Properties (6)

additional_info
SC305305
custom_field_two
4
customer
LACSD
datetime
2016-03-02T23:17:23-08:00
documentation
PRO-PIPE
is_lateral_inspection
false