Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Mar 3, 2016, 08:21 AM
  • 29 0340_29 0338_20160303_014135.mp4

Date
03/03/2016
W/O
557696
Weather
Dry
Operator/Surveyor
J. HARTOOG
Sewer ID
Z01017
PipeID
P24360
Time
12:21 AM
Certificate
U507-03-3386
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K3216
Sewer Name
29 PACIFIC COAST HIGHWAY SEWER
City
SIGNAL HILL
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 29
Page No.
03
Purpose
Routine Assessment
Project
WO_557696_TV29045_2016MAR
Sewer Type
GRAVITY
Material
Vitrified Clay Pipe
Shape
Circular
Height
8 in.
Upstream MH
29 0340
Downstream MH
29 0338
Dir. of Survey
Downstream
Length Surveyed
246 ft.
Total Length
246 ft.
Structural Index
3
Structural Quick
4137
Structural Rating
25
O&M Index
0
O&M Quick
0000
O&M Rating
0
Overall Index
3
Overall Quick
Overall Rating
25
Pipe schematic from manhole 29 0340 to 29 0338
MH: 29 0340MH: 29 0338downstream0 ft. MWL - Water Level, 5 %of cross sectional area0 ft. AMH - Upstream Manhole, Survey Begins - 29 03400 ft. MWM - Water Mark, 10 %of cross sectional area12.3 ft. CM - Crack Multiple, from 09 to 12 o'clock, within 8 inches of joint: YES12.7 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: YES, 4"27.8 ft. TFA - Tap Factory Made Active, at 09 o'clock, -, within 8 inches of joint: NO, 4"35.2 ft. TFC - Tap Factory Made Capped, at 03 o'clock, -, within 8 inches of joint: NO, 4"64.1 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: NO, 4"92.7 ft. TBA - Tap Break-In Active, at 02 o'clock, -, within 8 inches of joint: YES, 4"112.7 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: NO, 4"140.6 ft. TFA - Tap Factory Made Active, at 09 o'clock, -, within 8 inches of joint: NO, 4"152.2 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"161.6 ft. FM - Fracture Multiple, from 09 to 02 o'clock, within 8 inches of joint: YES162.3 ft. TFC - Tap Factory Made Capped, at 09 o'clock, -, within 8 inches of joint: NO, 4"206.7 ft. TFC - Tap Factory Made Capped, at 02 o'clock, -, within 8 inches of joint: NO, 4"208.9 ft. TFC - Tap Factory Made Capped, at 10 o'clock, -, within 8 inches of joint: NO, 4"218.8 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES223 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start245.7 ft. CM - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Finish246 ft. AMH - Downstream Manhole, Survey Ends - 29 0338

Observation photos (3)

  • Crack Multiple, from 09 to 12 o'clock, within 8 inches of joint: YES

    12.3 ft. - Crack Multiple, from 09 to 12 o'clock, within 8 inches of joint: YES

  • Fracture Multiple, from 09 to 02 o'clock, within 8 inches of joint: YES

    161.6 ft. - Fracture Multiple, from 09 to 02 o'clock, within 8 inches of joint: YES

  • Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

    223 ft. - Crack Multiple, from 09 to 03 o'clock, within 8 inches of joint: YES, Start

Observations (20)

DistanceCodeObservation
35.2TFC
245.7CM
218.8CM
152.2TFC
206.7TFC
208.9TFC
27.8TFA
12.7TFC
246AMH29 0338
223CM
64.1TFC
0MWL
140.6TFA
0AMH29 0340
162.3TFC
92.7TBA
161.6FM
0MWM
112.7TFC
12.3CM

Properties (6)

additional_info
SC305305
custom_field_two
3
customer
LACSD
datetime
2016-03-03T00:21:00-08:00
documentation
PRO-PIPE
is_lateral_inspection
false