Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 14, 2015, 12:33 PM
  • 01 0158_01 0157_14122015_044030.mp4

Date
12/14/2015
W/O
524985
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00204
PipeID
P02101
Time
4:33 AM
Certificate
12345
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K2961
Sewer Name
01 COMPTON CREEK EXTENSION TRUNK, SECTION 2
City
COMPTON
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
12
Purpose
Routine Assessment
Project
WO_524985_TV011104_NOV2015
Sewer Type
GRAVITY
Material
Vitrified Clay Pipe
Lining Method
Segmented Panel
Shape
Circular
Height
15 in.
Upstream MH
01 0157
Downstream MH
01 0158
Dir. of Survey
Upstream
Length Surveyed
363.3 ft.
Total Length
363.3 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
4
O&M Quick
4M00
O&M Rating
284
Overall Index
4
Overall Quick
Overall Rating
284
Pipe schematic from manhole 01 0157 to 01 0158
MH: 01 0157MH: 01 0158upstream0 ft. AMH - Upstream Manhole, Survey Ends - 01 01582.4 ft. DAGS - Deposits Attached Grease, 30 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Finish296.4 ft. MMC - Material Change, Cast Iron356.2 ft. DAGS - Deposits Attached Grease, 30 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start363.3 ft. MWL - Water Level, 30 %of cross sectional area363.3 ft. AMH - Downstream Manhole, Survey Begins - 01 0157363.3 ft. MWM - Water Mark, 40 %of cross sectional area

Observation photos (1)

  • Deposits Attached Grease, 30 %of cross sectional area, from 04 to 08 o'clock,  , within 8 inches of joint: YES, Start

    7.1 ft. - Deposits Attached Grease, 30 %of cross sectional area, from 04 to 08 o'clock, , within 8 inches of joint: YES, Start

Observations (7)

DistanceCodeObservation
360.9DAGS
0MWL
7.1DAGS
0AMH01 0157
363.3AMH01 0158
0MWM
66.9MMC

Properties (5)

custom_field_two
4
customer
LACSD
datetime
2015-12-14T04:33:42-08:00
documentation
PRO PIPE
is_lateral_inspection
false