Sanitation Districts of Los Angeles Countyt4 Spatial
Wastewater/Activity/PacpInspection/1.0Dec 17, 2015, 11:47 AM
  • 01 0161_01 0160_17122015_034837.mp4

Date
12/17/2015
W/O
524985
Weather
Dry
Operator/Surveyor
M.MARTINEZ
Sewer ID
Z00204
PipeID
P02104
Time
3:47 AM
Certificate
12345
System Owner
LACSD
Date Cleaned
Pre-Cleaning
Not Known
Media Label
K2964
Sewer Name
01 COMPTON CREEK EXTENSION TRUNK, SECTION 2
City
COMPTON
Loc. details
Light Highway
Location Code
C
Use of Sewer
Sanitary Sewer
District
District 01
Page No.
12
Purpose
Routine Assessment
Project
WO_524985_TV011104_NOV2015
Sewer Type
GRAVITY
Material
Vitrified Clay Pipe
Lining Method
Segmented Panel
Shape
Circular
Height
15 in.
Upstream MH
01 0161
Downstream MH
01 0160
Dir. of Survey
Downstream
Length Surveyed
329 ft.
Total Length
329 ft.
Structural Index
0
Structural Quick
0000
Structural Rating
0
O&M Index
3
O&M Quick
4L3L
O&M Rating
460
Overall Index
3
Overall Quick
Overall Rating
460
Pipe schematic from manhole 01 0161 to 01 0160
MH: 01 0161MH: 01 0160downstream0 ft. AMH - Upstream Manhole, Survey Begins - 01 01610 ft. MWM - Water Mark, 50 %of cross sectional area0 ft. MWL - Water Level, 20 %of cross sectional area1.9 ft. DAGS - Deposits Attached Grease, 15 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start1.9 ft. MGO - General Observation - PIPE MATERIAL LOOKS TO BE CONCRETE1.9 ft. DAE - Deposits Attached Encrustation, 30 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start83.3 ft. VC - Vermin Cockroach, within 8 inches of joint: YES326.1 ft. DAGS - Deposits Attached Grease, 15 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Finish326.1 ft. DAE - Deposits Attached Encrustation, 30 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Finish329 ft. AMH - Downstream Manhole, Survey Ends - 01 0160

Observation photos (3)

  • Deposits Attached Grease, 15 %of cross sectional area, from 03 to 09 o'clock,  , within 8 inches of joint: YES, Start

    1.9 ft. - Deposits Attached Grease, 15 %of cross sectional area, from 03 to 09 o'clock, , within 8 inches of joint: YES, Start

  • General Observation - PIPE MATERIAL LOOKS TO BE CONCRETE

    1.9 ft. - General Observation - PIPE MATERIAL LOOKS TO BE CONCRETE

  • Deposits Attached Encrustation, 30 %of cross sectional area, from 08 to 04 o'clock,  , within 8 inches of joint: YES, Start

    1.9 ft. - Deposits Attached Encrustation, 30 %of cross sectional area, from 08 to 04 o'clock, , within 8 inches of joint: YES, Start

Observations (10)

DistanceCodeObservation
0AMH01 0161
1.9DAGS
326.1DAGS
326.1DAE
1.9MGOPIPE MATERIAL LOOKS TO BE CONCRETE
0MWM
329AMH01 0160
0MWL
83.3VC
1.9DAE

Properties (6)

additional_info
SC224803
custom_field_two
4
customer
LACSD
datetime
2015-12-17T03:47:18-08:00
documentation
PRO PIPE
is_lateral_inspection
false